Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Marina Middle School Courtyard Restoration
Infrastructure
Bidding
$758,000 CJ est. value
San Francisco, CA 94123

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Storm Channel Cleaning Services
Term Contract
Sub-Bidding
$40,000 CJ est. value
Oxnard, CA 93030

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Plumbing Contractor
Term Contract
Results
Concord, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

General Construction Services
Renovation, Alteration
Post-Bid
CA

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Airport Plumbing Repairs and Inspections as Requested
Alteration
Post-Bid
Livermore, CA 94551

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

Last Updated 03/09/2023 05:10 PM
Project Title

Storm Water Pump and Motor Maintenance Services

Physical Address View project details and contacts
City, State (County) San Rafael, CA 94901   (Marin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Storm Water Pump & Motor Maintenance Services contract is intended for the maintenance of eight (8) pumps, four (4) motors and one (1) right-angle gearhead throughout the District , in Flood Control Zones #1, #3, #4 and #7. The Proposer, who enters into a contract with the District, shall be required to remove, examine, evaluate, report on, repair, perform several maintenance tasks and re-assemble a total of eight (8) pumps, four (4) motors and one (1) right-angle gearhead. Following the maintenance of each pump, the Proposer shall re-install the pump into each respective pump station The County of Marin reserves the right to reject any and all proposals and to elect not to enter into any contract for the services described in the scope of work Proposers may submit questions regarding this solicitation. All questions must be emailed to the LPetersen@marincounty.org or submitted on the Bid Express online platform and must be received by Thursday, February 23, 2023, no later than 4:00 PM PST. Questions asked after this date and time will not be considered. All questions shall be submitted to the.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents