Similar Projects
Countryside Estates 0.080 MGD Wastewater Treatment Plant
Post-Bid
Less than $2,000,000 est. value
Beaumont, TX 77705

Northeast WWTP UV System Project
Post-Bid
$515,000 to $580,000 est. value
Copperas Cove, TX 76522

Village Creek Water Reclamation Facility Biosolids Management and Beneficial Reuse
Results
Fort Worth, TX 76102

Pine Gully Wastewater Treatment Plant – Phase 1A
Results
$3,000,000 to $3,200,000 est. value
Seabrook, TX 77586

2019 Wastewater Treatment Plant Improvements
Post-Bid
Splendora, TX 77372

Wastewater Screening Equipment Installation and Influent Structure Modifications
Results
$350,000 est. value
New Boston, TX 75570

CMAR Services for Waste Water Treatment Plant
Post-Bid
$6,700,000 est. value
Fresno, TX 77545

Wastewater Treatment Plant Facilities Rehabilitation
Results
Less than $3,500,000 est. value
Houston, TX 77000

WWTP Phase I
Post-Bid
Conroe, TX 77301

Quanah Wastewater Treatment Plant Rehabilitation
Results
Quanah, TX

Wastewater Treatment Plant Phase I
Post-Bid
The Woodlands, TX 77381

Wastewater Treatment Plant No. 1 Phase II
Results
TX

CLCWA Wastewater Treatment Plant Belt Filter Press No. 1 Rehabilitation
Post-Bid
Houston, TX 77058

Decommissioning of 0.25 MGD Steel Packge Plant
Results
TX

Waste Water Treatment Plant Trickling Filters Rehabilitation
Post-Bid
Beaumont, TX 77705

Last Updated 11/06/2019 12:09 PM
Project Title

Fixed Aeration/Mixing Units for Temple Belton Channel 2

Physical Address View project details and contacts
City, State (County) TX 73301   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The BRA will purchase and install two (2) Fixed Aeration/Mixing Units for Channel (2) of the Orbal at the Temple-Belton Facility. Each unit shall consist of a 20 HP, 230/460 volt, 3 phase, 60 HZ, 900rpm, TEFC, premium efficiency motor. Field replaceable, water lubricated lower bearing and water-resistant sleeve. Each unit will also consist of a 316 SS Dual-Blade primary Powermix propeller along with 316 SS Saturn Ring diffuser with a 304 SS housing, mounting flanges and a hollow shaft. Each unit will have a universal bridge mount consisting of 304 SS rails and mounting hardware with a vortex shield attached to aerator housing with a hand winch assembly, for aerator retrieval. Included in this package shall be a 4 HP regenerative blower for each unit.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents