Similar Projects
2200 West Structures Project
Bidding
South Jordan, UT 84095

South Valley MS4
Term Contract
Bidding
Draper, UT 84020

Goose Creek Fire Riparian and Stream Restoration
Post-Bid
Salt Lake City, UT

Sandy Canal Trail 10600 South to Dimple Dell
Post-Bid
Sandy, UT

Prince of Wales Reclamation
Results
Less than $50,000 est. value
UT

City Drain Crossing at Hunter Stables
Results
Salt Lake City, UT

Excavation, Ground Prep and Turf Installation Contract
Term Contract
Bidding
Salt Lake City, UT 84115

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Rose Creek Box Culvert
Results
Riverton, UT

Sandy Canal Trail Design 9400 South to Lazon Drive
Post-Bid
Sandy, UT 84094

2540 South Box Culvert Extension
Results
Less than $130,000 est. value
West Valley City, UT

Emigration Canyon Overlay
Post-Bid
$3,800,000 to $4,800,000 est. value
Salt Lake City, UT

DFCM Construction-Pre Qualified General-Heber Wells Main Drain Line Replacement
Results
Less than $330,544 est. value
Salt Lake City, UT 84114

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Aqueduct Relocation at Bangerter Hwy at 6200 South TIF - Transportation Investment Fund
Results
$6,000,000 to $10,000,000 est. value
UT

Reported 08/29/2019 12:00 AM
Project Title

Drainage Pipe Installation and Road Repair

Physical Address View project details and contacts
City, State (County) (Salt Lake, Summit, Tooele Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Drainage Pipe - 18 Inch, Thermoplastic, Leak-Resistant, 220 Ft. Install Two (2) 110 Long Foot Sections (Complete With 2 End Sections For Each Pipe) Across Sr-201 Spaced 100 Feet On Each Side Of And Parallel To The Existing 18 Inch Culvert Located At Approximate Mp 2.15. Saw-Cutting And Connections To Drainage Structures As Shown In The Standard Drawings Are Incidental To Construction And No Separate Payment Will Be Made. Assume Drainage Pipe Slope To Be 0.3%.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents