Similar Projects
Water Main Replacement from 2133 to 2243 Hamilton - Cleves Road
Results
Less than $196,000 est. value
Hamilton, OH 45011

Liner Pipe / Cured-In-Place-Pipe (Cipp) / Joint Seals
Term Contract
Results

Rosedale Road Water Main Replacement
Results
Less than $1,511,330 est. value
Middletown, OH 45042

O'leary Wendel Water Main Replacement Project
Results
Less than $555,363 est. value
Hamilton, OH 45011

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Highland Park Water Main Replacement
Results
Less than $403,784 est. value
Hamilton, OH 45011

Middletown-Eaton Road Water Main Replacement
Results
Less than $750,000 est. value
Hamilton, OH 45013

Bluebird Goldfinch Water Main Replacement
Results
Less than $2,172,466 est. value
OH

Wayne-Madison Road and Restoration
Results
Less than $201,033 est. value
Trenton, OH 45067

Fire Hydrants
Term Contract
Results
Middletown, OH

2020 Resor Road and Winton Road Water Main Replacement
Results
Less than $949,301 est. value
Fairfield, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Oxford-Millville Road Waterline Extension
Results
Oxford, OH

Moore Road Water Main Replacement
Post-Bid
Middletown, OH

Residential Water Meters
Term Contract
Results
Middletown, OH

Last Updated 04/17/2020 09:47 AM
Project Title

Garver Road Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Monroe, OH 45050   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $398,741
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 1800 lineal feet of water main replacement including new fire hydrants and appurtenances. This project will also include the abandonment of the existing water main, demolition and removal of existing concrete and asphalt along the new water main alignment, miscellaneous excavation and grading, testing, topsoil, seed and straw. The work shall commence within 30 calendar days of the acceptance of the contract proposal.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents