Similar Projects
2021 City Facility Parking Lot Resurfacing and Concrete Repairs
Bidding
Dayton, OH

Miami Township Library Roofing Project
Bidding
$140,000 est. value
Miamisburg, OH 45342

Installation of New Roof System on 8-9 Dwellings
Post-Bid
Kettering, OH 45420

Parking Lot Maintenance Phase 4 Lots A and D Sinclair Community College
Post-Bid
Less than $824,285 est. value
Dayton, OH

Parking Lot Maintenance, Lots A, C and D Sinclair Community College
Results
Less than $777,000 est. value
Dayton, OH 45390

Dayton FB, Parking Lot, NARA-New O&M Contract
Results
Dayton, OH 45402

Removal and Replacement of Certain Curbs and Sidewalks project
Bidding
Vandalia, OH

Northeast Priority Board Roof Repairs
Post-Bid
Dayton, OH

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Keowee Street Rehabilitation
Bidding
Dayton, OH 45426

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Cafeteria Roof Replacement Project
Bidding
Kettering, OH 45419

Ridgecrest Park Shelter Roof Replacement
Post-Bid
Dayton, OH

DIA Terminal, Concourses, U.S. Customs Building, and ARFF Facility Roof Replacement
Results
Less than $1,421,149 est. value
Dayton, OH 45390

Last Updated 12/18/2020 10:01 AM
Project Title

City Hall Ludlow Street Vault Roof Slab Replacement and ADA Access (Open Market)

Physical Address View project details and contacts
City, State (County) Dayton, OH   (Montgomery County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Roofing, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $864,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of full depth replacement of the Ludlow Street vault roof slab, which also serves as the section of section of sidewalk along Ludlow Street. The structure is a split slab with an approximately 8” structural slab waterproofed with a hot applied polyurethane membrane protected by an approximately 5” topping slab. Existing MELP (mechanical, electrical, and plumbing) within the vault will need to be adequately protected, relocated, supported, etc., assume that all equipment needs to remain in service throughout the duration of construction with the exception of lighting within the vault area which can be temporarily removed from service during construction and reinstalled at the end of the project. Existing beams and foundation walls will need to be shored. Existing beams will be encased and enlarged. Existing exterior fall protection railings at window wells will be replaced with similar, architectural railings. ADA access will be provided at the Ludlow Street entrance to City Hall as part of this project which will include construction a new ramp and landing in front of the existing entrance and leveling a portion of the interior stairs and installing stairs and installing a new ADA lift. Selected structural repairs within the vault are also included including overhead and vertical concrete patch repairs at beams, columns, and walls.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents