Similar Projects
Highway Signs/Guardrails/Barriers Construction Project Lead, Box Elder, SD 57719 (Pennington County)
Reported | 04/09/2021 12:00 AM |
Project Title | 2021 Pavement Marking |
Physical Address | View project details and contacts |
City, State (County) | Box Elder, SD 57719 (Pennington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall consist of centerline, pavement edge, turn lanes, turn arrows, stop bars, railroad crossing, center turn lane transition, and pedestrian crossing bars at various street locations throughout the City of Box Elder. The areas of work are as follows: 1.Box Elder City Hall parking lot, 2.Community (Bandit Ball) Park parking lot, 3.225th from Tower Road to 150th Avenue–solid double yellow striping,solid white fog line, and pedestrian crosswalks (4), 4.Briggs Street -solid double yellow striping,solid white fog line, stop bar, and pedestrian crosswalks (4), 5.Cheyenne Blvd–solid double yellow, solid yellow w/dashed left turn, solid yellow, solid white, dashed white, lane divider hatching,and pedestrian crosswalks(6), 6.Ellsworth Road from Box Elder Road to the Patriot Gate entrance to Ellsworth Air Force Base–solid double yellow, solid yellow, solid white, left turn arrows(17), rightturn arrows(3), stop bars(2), pedestrian crosswalks(2)(note there are several left turn arrows which will not be repainted and one which will be “moved”from its current location just north of the post office entrance such that it will point at the post office entrance), 7.Liberty Boulevard from Ellsworth Road to Tower Road –solid double yellow, solid yellow w/dashed left turn, solid white, dashed white, left turn arrow(11), right turn arrow (5), “ONLY”annotation, stop bars(3), pedestrian crosswalks(2), 8.Northern Lights Boulevard –pedestrian crosswalks (3), 9.Patriot Drive –pedestrian crosswalks (3) and stop bars(2), 10.Prairie Road –stop bars (2), pedestrian crosswalks(2), 11.Radar Hill Road –solid double yellow, solid yellow w/dashed left turn, solid white, left turn arrows (4), stop bar(1), yellow cross hatching, and railroad crossing(2 sides). 12.Radial Lane –pedestrian crosswalk(1) and stop bar(1), 13.Reagan Avenue –solid double yellow, solid yellow w/dashed left turn, solid white, and left turn arrows (5), 14.Tower Road –solid white, left turn arrows(2), right turn arrows(4), stop bars(3), pedestrian crosswalks(7),and 15.West wind Drive stop bars(3) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |