Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

Six Box Hangars - TR-AP-10-01 - City of Ann Arbor
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Ann Arbor, MI 48108

Residential and Commercial Development
New Construction, Infrastructure - 11,623 SF
Design
$3,000,000 CJ est. value
Marquette, MI 49855

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

Sturgeon River Bridge Rehabilitation
Infrastructure
Bidding
$580,000 CJ est. value
Foster City, MI 49834

Newberry Correctional Facility (NCF) Water Systems Repair/Replacement
Infrastructure
Bidding
$1,557,505 CJ est. value
Newberry, MI 49868

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Site Improvements and Extension of Existing Utilities
Infrastructure
Post-Bid
Ada, MI 49301

Site Improvements
Infrastructure
Results
Ionia, MI 48846

Senior Center Parking Lot Replacement
Infrastructure
Results
$176,520 CJ est. value
Rockwood, MI 48173

PNC Bank Branch No. B839
Renovation
Construction
Wyoming, MI 49509

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

Oakbrook Drive Extension (West of State Street) - TR-NS-95-01 - City of Ann Arbor
Infrastructure
Conception
$2,475,000 CJ est. value
Ann Arbor, MI 48103

Last Updated 10/13/2022 09:39 AM
Project Title

Azalia Solar Farm / Milan Township

Physical Address View project details and contacts
City, State (County) Dundee, MI 48131   (Monroe County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for new construction of a 150MW solar farm. As of October 13, 2022, the project is in planning and development. Community Information meeting is scheduled for October 19, 2022. The project received zoning approval from the Planning Commission for the City of Milan Township on August 11, 2020. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however, construction is not expected to begin prior to second quarter 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents