Similar Projects
Alberton Parkway Sewer and Water Main Extension Project
Infrastructure
Bidding
$455,000 est. value
Alberton, MT

Water System Improvements
Infrastructure
Bidding
$390,000 est. value
Richey, MT

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Water System Improvements
Infrastructure
Results
Billings, MT 59105

2022 North 7th Avenue Water Renovations
Infrastructure
Bidding
$427,000 est. value
Bozeman, MT 59715

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Elks Riverside Park Force Main Replacement
Infrastructure
Bidding
$300,000 est. value
Great Falls, MT 59401

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Phase 5 Water System Improvements
Infrastructure
Bidding
$3,400,000 est. value
Harlowton, MT

Spokane Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Whitefish, MT 59937

Stoddard or Cooley Water Main Replacement Project
Infrastructure
Results
Missoula, MT 59802

Last Updated 06/13/2022 11:06 PM
Project Title

Southwest Side Water Main Replacement Phase III

Physical Address View project details and contacts
City, State (County) Great Falls, MT   (Cascade County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: approximately 2,420 lineal feet of 6-inch and 8-inch PVC water main replacement; 1,210 lineal feet of 12-inch water main replacement; remove and replace 6 fire hydrants; 93 - 3/4 -inch or 1-inch water service connections; 3,950 Square Yards 1 1/2 -inch base course gravel; 4,400 Square Yards of asphalt removal and replacement. Contact the City Engineering Office at 406-771-1258 with any questions. Bidder questions will be accepted until 12 p.m. local time on May 20, 2022 and must be provided in writing via e-mail to Richard Johnson at rjohnson@greatfallsmt.net. CONTRACTOR and any of the CONTRACTOR'S subcontractors doing work on this project will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. CONTRACTOR is not required to have registered with the DLI prior to bidding on this project, but must have registered prior to execution of the Construction Agreement. All laborers and mechanics employed by the CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of the City of Great Falls and the State of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, national origin, or other class protected by state or federal law. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to City of Great Falls, in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Contractor and all subcontractors must be licensed to perform work in the City of Great Falls prior to contract award. The City of Great Falls reserves the right to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the City's best interests.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents