Similar Projects
ATS Equipment, Inc.
New Construction, Renovation - 15,345 SF
Design
Manchester, NH 03104

Nansen Ski Jump - Sitework
New Construction
Design
Milan, NH 03588

Improvement of a Section of The Conway Recreation Path
Bidding
Conway, NH 03860

Pine Grove Coop Water System - Distribution Improvements
Renovation
Post-Bid
Swanzey, NH 03446

Bio-Swales and Bioretention Installation
New Construction
Post-Bid
Meredith, NH

USNH Excavation Services
Results
Durham, NH 03824

Site Work for Salt/Sand Storage Building
Results
Danville, NH

Parking Lot
New Construction
Construction
$150,000 est. value
Lancaster, NH 03584

Banks Chevrolet Parking Lot
New Construction - 4,900 SF
Construction
$10,000,000 CJ est. value
Concord, NH 03301

Cross Farm Elderly Housing Development
New Construction
Pending Verification
Londonderry, NH 03053

Novo Nordisk Compressed Natural Gas Facility and Site Improvements
New Construction
Pending Verification
Lebanon, NH 03784

People's United Bank Drive Thru Canopy Redevelopment
Renovation
Design
Exeter, NH

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Water Upgrades and Site Improvements
Results
Less than $2,995,080 est. value
Center Strafford, NH 03815

Building Cluster 5, Stormwater Management Improvements 1000 Hilltop Place
Construction
New London, NH 03257

Last Updated 12/23/2020 04:29 PM
Project Title

Dolly Copp Construction Phase III

Physical Address View project details and contacts
City, State (County) Gorham, NH   (Coos County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of upgrades at Dolly Copp Campground in the following areas; Volunteer’s loop - sign/entrance area; All site work on little Meadow; All site work on Big Meadow; All work on Host Sites; All work related to runoff improvements on Birch Lane. Project is on the National Forest and is located off of the Pinkham B Road, accessed from Highway 16, approximately 5 miles south of Gorham, NH.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents