Last Updated | 01/13/2021 08:09 AM |
Project Title | Mainline Pavement and Toll Pavement Improvements |
Physical Address | View project details and contacts |
City, State (County) | Berea, OH (Cuyahoga County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $55,900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removing and reconstructing the pavement in the right two (2) lanes and shoulders in both directions of the Ohio Turnpike. The Work includes, but is not limited to, inside widening pavement to the median with an addition lane and shoulder in both directions, excavating existing pavement, constructing full depth pavement, chemically stabilizing the subgrade, constructing approach and departure ramp pavement for existing toll plaza in the Westbound directions, demolishing a portion of the existing Eastgate Toll Plaza Canopy, tolling lanes and toll booths, performing drainage repairs and replacements, installing concrete barrier wall, asphalt curbs, guardrail, performing approach slab replacements, installing new box trusses and cantilever sign supports, pavement markings and other traffic control devices, performing temporary traffic control, tree removal, clearing and grubbing, right of way fence replacement, and coordination with the 58-21-04 Building Contractor and the Toll Collection Systems Integrator Contractor on the north side of the Ohio Turnpike. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |