Similar Projects
Replace Roof/ Camp Williams
Alteration
Conception
$568,800 est. value
New Lisbon, WI

Replace Building 6 A-Wing Roof
Renovation
Sub-Bidding
$1,000,000 CJ est. value
West Milwaukee, WI 53214

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Sub-Bidding
$232,920 CJ est. value
Milwaukee, WI 53209

Forest County Roof Replacement
Renovation
Post-Bid
Crandon, WI

Roof Replacement
Post-Bid
Fond du Lac, WI 54935

Roof Repairs
Renovation
Results
La Crosse, WI 54601

NWTC Areas A & B Roofing
Results
Marinette, WI 54143

Service Center Roof Recover and DD Building Roof Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Hudson, WI 54016

Library Roof Replacement
Alteration
Post-Bid
Watertown, WI 53094

Esker Hall Roof Replacement
Results
$950,000 est. value
Whitewater, WI 53190

Roof Maintenance - Building 36, Century City Business Park
Term Contract
Sub-Bidding
Milwaukee, WI 53216

City Hall Roofing Project 2021
Alteration
Post-Bid
Lake Geneva, WI 53147

Highway Salt Shed Roofing, Siding and Repairs
Results
Plover, WI 54467

Roof Replacement MEP
Renovation
Sub-Bidding
$1,635,800 CJ est. value
Madison, WI 53706

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Last Updated 09/28/2022 05:09 PM
Project Title

EPDM Roof Replacement - Wastewater Treatment Plant Solids Processing Building

Physical Address View project details and contacts
City, State (County) Janesville, WI 53548   (Rock County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate - 09/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Janesville, Wisconsin hereby gives notice that it will receive electronic bids for the following listed Public Work: C2022-15 EPDM Roof Replacement - WWTP Solids Processing Building and Janesville Riverside Golf Course Clubhouse: For furnishing all the labor, materials, equipment, and doing all the work necessary to replace the existing single ply fully adhered EPDM roof system. The Solids Processing Building has two roof levels totaling approximately 18,300 square feet is size. The existing roof is a fully adhered EPDM roof on a tapered iso insulation system and is to be completely removed down to the existing precast concrete deck surface. The new roof system to be installed is a fully adhered EPDM membrane on a tapered iso insulation system on a new vapor barrier. Project scope includes cleaning, sealing, and caulking of the precast mansard panels. The Golf Course Clubhouse is approximately 5,200 square feet in size. The existing roof is a combination of a ballasted and fully adhered EPDM and iso insulation on a tectum deck and is to be completely removed. The new roof system to be installed is a fully adhered EPDM membrane on an iso insulation system. All bidders shall bid in accordance with contract documents Section 2 Information to Bidders. The above Public Work will be let to the lowest responsible bidder and must be performed in accordance with the plans, specifications, and contracts on file with the City Clerk. The determination of the lowest responsible and best bid will be decided by the City Engineer, subject to review by the City Council. The Council reserves the right to reject any and all bids. No bid will be considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and performance bond within ten days from the date the lowest responsible bidders bid is accepted. In case the bidder fails to execute such contract and performance bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. If applicable, Federal Davis Bacon wage rates are included in the Contract Documents, as well as on file in the City Clerks Office. No bidder may withdraw their bid within 45 days after the actual date of the bid opening.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents