Similar Projects
Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Wayne Road over Tonquish Creek Bridge Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Westland, MI 48185

Wayne Road over Tonquish Creek Bridge Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Westland, MI 48185

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Asphalt Resurfacing
Infrastructure
Post-Bid
Dearborn, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Jefferson Avenue Over Huron River Bridge Reconstruction
Term Contract
Results
Detroit, MI 48200

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Pavt Repairs on M-53 From 8 Mile to Harper
Infrastructure
Post-Bid
Detroit, MI

2020-2021 Alley Reconstruction Program
Results
Hamtramck, MI 48212

M-8 HMA Pavement Patches, Livernois to M-10
Infrastructure
Post-Bid
Detroit, MI

Bridge Rehabilitation
Results
Detroit, MI

Last Updated 11/15/2022 02:03 PM
Project Title

Allen / CN RR Grade Separation - 30-217B - Wayne County

Physical Address View project details and contacts
City, State (County) Woodhaven, MI 48183   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface Allen from Railroad track to West Road, widen and resurface Allen from Vreeland to Van Horn, Reconstruct Van Horn East of Allen, Van Horn Culvert Over Blakely Drain Replacement. As of November 15, 2022, this project is included in the Wayne County FY 2022-2026 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents