Similar Projects
Last Updated | 02/04/2022 10:01 AM |
Project Title | Murray County High and Early Learning Center School Renovations Modifications and Additions |
Physical Address | View project details and contacts |
City, State (County) | Chatsworth, GA 30705 (Murray County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Murray County Board of Education is considering the services of a Construction Management Firm (CM/GC) for the projects listed above to be referred to as (“The “Project”). The CM/GC will assume responsibility for project construction cost by issuing a guaranteed maximum price not later than 90% through the design phase. The GMP will be a contractual obligation. CM/GC will also develop an overall project schedule, which will be a contractual obligation. In addition, CM/GC will be responsible for methods of construction, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and schedule. The CM/GC will be expected to work closely with the Architect. When design documents for the project have been developed in sufficient detail (approximately 90% complete), the CM/GC, with the support and assistance of the Architect, will commit to a Guaranteed Maximum Price (GMP) for all construction and site development. The Owner reserves the right to request an alternative additive item for FF&E, which we may ask to be included in the GMP. (The Owner will accept or reject this item prior to finalizing the GMP.) Construction will commence with the release of distinct work packages while the total design documents are being finalized. The CM/GC shall competitively select all construction subcontracts and other work appropriate for competitive selection using cost, other factors, and including owner input. |
||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |