Similar Projects
CTH PF - USH 12 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
North Freedom, WI 53951

CTH PF - USH 12 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
North Freedom, WI 53951

Wisconsin Dells - Baraboo Re - Ops for 6145-01-72
Infrastructure
Design
$250,000 to $500,000 est. value
Baraboo, WI

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Lavalle - Mauston, Sth 33 to 0.05 Mi. N. Sara Lane
Infrastructure
Bidding
$4,000,000 CJ est. value
New Lisbon, WI 53950

Lavalle - Mauston, Sth 33 to 0.05 Mi. N. Sara Lane
Infrastructure
Bidding
$4,000,000 CJ est. value
New Lisbon, WI 53950

2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

Local Road Maintenance
Post-Bid
La Valle, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Sycamore Street Reconstruction
Results
Sauk City, WI 53583

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

TID 9 Business Park Hotel Infrastructure
Infrastructure
Bidding
$700,000 CJ est. value
Winfield, WI 53959

2021 Road Improvements
Post-Bid
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Last Updated 08/29/2022 11:32 PM
Project Title

2021 Vault Toilet Replacement Group 2

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $278,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of : site work to prepare various sites within Wisconsin State Parks located in Sauk and Junea Counties for installing new vault toilet privies. Includes removing and disposing of existing vault toilet privies at most of the sites. Includes minor grading and subgrade preparation for installing concrete walks and asphalt paths. The vault toilets for the project are pre-manufactured buildings and will be provided and placed by the manufacturer, only the site preparation is necessary prior to the buildings being placed. After the placement, the flatwork and site restoration are then required. Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 18 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Multiple Locations Are Available In This Project.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents