Similar Projects
Sludge Tank Aeration Equipment Replacement
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Hebron, KY 41048

Bowling Green Municipal Utilities Water Recovery Facility Headworks Odor Control Construction
New Construction, Infrastructure
Post-Bid
$800,000 CJ est. value
Bowling Green, KY 42101

David Hawes Plant Maintenance Building
Renovation, Addition
Post-Bid
$350,000 est. value
Owensboro, KY 42303

Jerry Riley WWTP - Lagoon 2 Liner Replacement
New Construction - 222,000 SF
Results
$600,000 to $800,000 est. value
Bardstown, KY 40004

Derek R. Guthrie Water Quality Treatment Center (DRGWQTC) Sodium Bisulfite Building Improvements
Renovation
Results
$2,782,000 CJ est. value
Louisville, KY 40272

Black Oak Sewer Consolidation Project - Contract II (Wastewater Treatment Plant)
Renovation, Infrastructure
Construction
$800,000 CJ est. value
Vanceburg, KY 41179

2019 Water System Improvements Contract 12 - New Water Treatment Plant and Improvements
New Construction, Infrastructure
Construction
$1,180,000 CJ est. value
Sandy Hook, KY 41171

Dry Run Wastewater Treatment Plant
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Shelbyville, KY 40065

Morris Forman Water Quality Treatment Center (WQTC) Groundwater Dewatering System Automation
Renovation, Infrastructure
Results
$1,267,500 CJ est. value
Louisville, KY 40211

Plant a Collector Line Relocation Project
Infrastructure
Post-Bid
$90,000 CJ est. value
Owensboro, KY 42303

MFWQTC Computer Room Upgrades
Renovation
Results
$1,469,000 CJ est. value
Louisville, KY 40211

Influent Screen 2 Replacement
Renovation
Post-Bid
$1,120,000 CJ est. value
Bowling Green, KY 42101

Taylor Mill Treatment Plant Sanitary Sewer Relocation
Infrastructure
Results
$71,420 CJ est. value
Taylor Mill, KY 41015

Memorial Parkway Treatment Plant Actiflo Upgrades
Renovation
Post-Bid
$220,000 CJ est. value
Fort Thomas, KY 41075

Water Treatment Plant Improvements
Renovation, Infrastructure
Results
$551,450 CJ est. value
Campbellsville, KY 42718

Last Updated 06/12/2023 11:33 PM
Project Title

Mcmanis WWTP UV Improvements

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,973,737 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids shall be accompanied by a certified check or bid bond payable to the City of Frankfort in an amount not less than ten percent (10%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time Time allowed for completion of the Project is: 270 consecutive calendar days. The City of Frankfort Sewer Department reserved the right to reject any and all bids and to waive viewed and evaluated by a selection committee Please email David Schrader at dschrader@hkbell.com with questions. Bid Result. SECTION 1:PACE CONTRACTING $2,719,897.00 SECTION 2:HERRICK CO $111,300.00 DIVISION B:PACE CONTRACTING $142,540.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents