Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Water Meter
Term Contract
Results
Dover, DE

2020 Streets Utility Project
Infrastructure
Results
Milford, DE

TPE DE NE91 Oak Lane Farm Solar
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Brecknock Park - Historic Structure Improvement - Kent County
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Camden Wyo, DE 19934

College Road Pump Station Upgrade/Replacement
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dover, DE 19904

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Underground Utility Locating Services
Term Contract, Infrastructure
Results
Dover, DE

PS24A (Carter Rd) Main Transmission pump upgrades, piping and forcemain improvements - CS11 - Kent County
Infrastructure
Conception
$2,100,000 CJ est. value
Smyrna, DE 19977

Last Updated 09/07/2022 11:31 AM
Project Title

Route 13 Forcemain Relocation - South Dover - County of Kent

Physical Address View project details and contacts
City, State (County) Dover, DE 19901   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In coordination with DelDOT's widening along the US13 corridor, this is a main sewer transmission relocation project of the original 30" concrete forcemain from PS 3, starting at Puncheon Run stream to Sandy Hill. The funding source is State of Delaware Revolving Fund Loan. As of September 7, 2022, this project is currently in the FY 2022-2026 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents