Similar Projects
Wheeling Police Department Renovations
Renovation, Addition - 31,512 SF
Post-Bid
Wheeling, WV

Stucco the Front of the Nitro Fire Station
Post-Bid
Kanawha, Nitro, WV 25143

Construction of the New Putnam County Sheriff Headquarters Building
New Construction, Renovation - 23,400 SF
Bidding
Winfield, WV 25213

Fire Department Headquarters
New Construction
Design
$6,400,000 est. value
WV 26003

New Fire Station
New Construction
Design
Ridgeley, WV

Sheriffs Department Facilities Construction & Renovation
New Construction, Renovation - 15,500 SF
Design
$6,720,000 est. value
Winfield, WV

Cabell County Sheriff's ONA Field Office and Garage
New Construction
Post-Bid
Ona, WV 25545

Permanent Jefferson County Sherriffs Office
New Construction
Pending Verification
$6,000,000 est. value
WV

New Fire Station
New Construction
Post-Bid
Shady Spring, WV 25918

Police Department Renovation
Renovation - 1,330 SF
Results
$237,000 est. value
Charleston, WV 25301

New Fire Department Facility
New Construction
Post-Bid
Hurricane, WV

Fire Tower Design and Installation of an Elevator
New Construction, Term Contract
Post-Bid
Beaver, WV 25813

New Baker Heights Volunteer Fire Station
New Construction - 17,350 SF
Construction
Martinsburg, WV 25401

Moundsville Municipal Building
Renovation - 25,672 SF
Results
Moundsville, WV

Last Updated 02/22/2022 10:37 AM
Project Title

University Fire Station No. 2

Physical Address View project details and contacts
City, State (County) Huntington, WV 25703   (Cabell County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000 to $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work will include a new curb cut entrancy/exit to Artisan and 9th Avenues, new curbs and gutters at all street edges, new parking and drive pavement, new sidewalks, landscaping, utilities, stormwater management features, site lighting, fencing and gates. An area of over-excavation is identified where unsuitable soils were identified in the Owner's geotechnical report. Building construction work includes: Conventional concrete spread footings, concrete slab on grade, concrete masonry unit bearing and non-bearing walls, steel structure, cold-formed metal framing, exterior cladding of brick veneer and MCM panels, windows, overhead doors, aluminum storefront and glazing, interior non-load bearing partitions, wood and hollow metal doors, acoustical lay-in and gypsum board ceilings, wall and floor finishes; casework, residential appliances, equipment; automatic sprinkler system, ductwork, HVAC, plumbing, lighting, electrical and telecommunication systems.

Details

1 Fire/Police Station, 7,807 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents