Similar Projects
City Hall - Solar Rooftop / Canopy Project - City of Costa Mesa
Renovation
Conception
$400,000 est. value
Costa Mesa, CA 92626

City Hall - Training Room - 200080 - City of Costa Mesa
Renovation
Conception
$400,000 est. value
Costa Mesa, CA 92626

Civic Center Cooling Tower Replacement Project
Alteration
Bidding
$200,000 est. value
Laguna Hills, CA 92653

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Upgrade at the District Operations Center
Alteration
Results
Santa Ana, CA 92799

Fullerton College Swing Space
Renovation, Alteration
Results
$420,000 est. value
Fullerton, CA 92832

Pollak Library South HVAC Duct Cleaning
Alteration
Post-Bid
Fullerton, CA 92831

Golden West College LRC Duct Work Replacement
Renovation, Alteration
Results
$400,000 est. value
Huntington Beach, CA 92647

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Fullerton DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Fullerton, CA 92832

Heating, Ventilation and Air-Conditioning (HVAC) Preventative Maintenance and Repair Services
Alteration
Results
CA

Police Headquarters Lobby Roof and HVAC Rehabilitation
Term Contract
Post-Bid
Orange, CA 92867

Various Facilities HVAC Replacement
Alteration
Results
$138,000 est. value
Costa Mesa, CA 92626

Heating, Ventilation, Air Conditioning and Refrigeration Parts and Equipment
Term Contract
Post-Bid
Tustin, CA

San Clemente City Hall Council Chambers Tenant Improvement
Renovation
Results
$1,200,000 est. value
San Clemente, CA 92673

Last Updated 07/21/2022 02:15 PM
Project Title

City Hall & Bell Tower Regional Community Center HVAC Replacement - ARPA

Physical Address View project details and contacts
City, State (County) Rancho Santa Margarita, CA 92688   (Orange County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $375,250 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work is comprised of public works construction including removing and replacing HVAC units, disconnecting and reconnecting existing air purification ionizer and thermostats, and other miscellaneous improvements as shown on the plans and as required to complete the work. AWARD OF CONTRACT: The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. Within three (3) business days of bid opening, contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within five (5) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement and Insurance. Within ten (1 0) working days after the date of the Notice of Award, the successful bidder will be required to submit Bonds (Faithful Performance and Material and Labor), and Construction Schedule. CONTRACTORS LICENSE CLASSIFICATION: The Contractor shall possess a valid Class C-20- HVAC Contractors License at the time of submitting bids, in accordance with provisions of Chapter 9, Division Ill of the California Business and Professions Code. WAGE RATE REQUIREMENTS: The wage rates applicable to this Project are the State of California Department of Industrial Relations prevailing rates of per diem wages and the U.S. Davis-Bacon Wage Rates for Federally-Funded Projects. Not less than higher of the State or Federal prevailing wage rates shall be paid for work on this Project. In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem wages as determined by the State Director of Industrial Relations are available at City Hall, which shall be made available to any interested party upon request, or on the Internet at the State Department of Industrial Relations websiteunder Statistics and Research. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor to pay not less than said specified rates to all workers employed by them in the execution of the contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770- 1781 RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payments by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments. The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City. For any questions regarding acquisition of Contract Documents, contact Tri Nguyen at tnguyen@cityofrsm.org.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents