Similar Projects
Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

Transportation Alternative Program (TAP) Pedestrian Safety Improvements Route 9D, West Main Street
Results
$400,000 to $500,000 est. value
Wappingers Falls, NY 12590

Accessibility Improvements to the Town Hall
Results
Poughquag, NY 12570

Hudson Hall Walkway Replacement
Term Contract
Post-Bid
Poughkeepsie, NY 12601

Replacement and Extension of Elm Street and Charles Colman Boulevard Sidewalk
Results
Less than $461,000 est. value
Pawling, NY 12564

Scattered Sidewalk, Program Repair and Restoration
Post-Bid
Poughkeepsie, NY 12602

Boat House Exterior Improvements
Results
Wappingers Falls, NY 12590

Liberty Street Parking Lot Improvements
Post-Bid
Poughkeepsie, NY 12601

Fishkill Elementary Parking Lot Expansion
Results
Less than $105,000 est. value
Fishkill, NY 12524

2020 J. H. Ketcham Memorial Park Driveway and ADA Parking
Post-Bid
Dover Plains, NY 12522

Dutcher Avenue (CR69) and Henry Street Intersection Improvement Project Village of Pawling
Results
Poughkeepsie, NY

Pedestrian Safety Improvements
Post-Bid
Poughkeepsie, NY 12601

Downtown ADA Improvements Project
Results
Amenia, NY

Millerton Main Street Sidewalk Replacement Project
Post-Bid
Millerton, NY

Last Updated 05/27/2021 08:15 AM
Project Title

Wilkes Street Walkway

Physical Address View project details and contacts
City, State (County) Beacon, NY 12508   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of new 6-foot wide paved walkway along the length of Wilkes Street, between Fishkill Avenue and Matteawan Road. Installation includes removal and stockpiling of existing topsoil, installation of subbase material, installation of pavement, installation of concrete transition slabs, installation of wooden guide rail through parking lot, grading along walkway, installation of cross-walks, installation of stop bar and topsoil and seeding of all disturbed areas.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents