Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Sunrise Mall Macy's Redevelopment Phase 2
New Construction
Conception
Citrus Heights, CA 95610

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Dana House Boutique Hotel
New Construction - 125,049 SF
Design
$10,000,000 CJ est. value
Dana Point, CA 92629

Surfin' Chicken
Renovation - 1,403 SF
Bidding
San Diego, CA 92111

Surfin` Chicken
Renovation - 2,055 SF
Bidding
Poway, CA 92064

Target #T0307 - Remodel
Renovation - 1,400 SF
Post-Bid
Cathedral City, CA 92234

Target #T0322 - Cafe Remodel
Renovation - 2,685 SF
Post-Bid
Mountain View, CA 94040

Construction Management Services
New Construction
Results
$75,000,000 est. value
Martinez, CA 94553

Claremont Middle School New Multi Purpose Building and Kitchen
New Construction
Results
$13,000,000 est. value
Oakland, CA 94618

Benihana Sushi & Japanese Restaurant
Addition - 580 SF
Construction
$200,000 est. value
Torrance, CA 90503

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

Oakland A's Stadium & Mixed-Use Development
New Construction - 550,000 SF
Pending Verification
$10,000,000 CJ est. value
Oakland, CA 94607

Cross Creek Ranch Mixed Use Development
New Construction
Pending Verification
$130,000,000 est. value
Malibu, CA 90265

Sunrise Mall Redevelopment Phase 3
New Construction
Conception
Citrus Heights, CA 95610

Reported 06/13/2022 12:13 PM
Project Title

Handel's Ice Cream Parlor

Physical Address View project details and contacts
City, State (County) Visalia, CA 93277   (Tulare County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents, Construction Start Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for renovating a tenant space to house an ice cream parlor. As of June 10, 2022, this project is pending site plan approval. While a construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details: however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, 1,908 SF Build-Out.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents