Similar Projects
Service Road Replacement
Infrastructure
Design
$250,000 to $500,000 est. value
Saint Louis, MO 63102

RFQ - Diversity, Equity, and Inclusion (DEI) Consulting Services
Term Contract
Bidding
Saint Louis, MO 63103

RFQ Engineering - Principal Arterials Traffic Safety Enhancements
Term Contract
Bidding
Saint Louis, MO 63103

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFQ - Master Plan and ALP Update
Term Contract
Bidding
Saint Louis, MO 63103

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

RFQ - Developers For the Housing Access and Neighborhood Stabilization Revolving Loan Fund
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Saint Louis, MO 63103

Professional Engineering Services for Preparation of Design-Bid-Build Documents and Design-Build Request for Proposals for Various Projects Types at DOD and Non-DOD Activities
New Construction, Renovation, Term Contract
Post-Bid
Less than $30,000,000 est. value

RFQ Engineering - St. Louis District, Various Routes
Infrastructure
Bidding
$15,283,097 CJ est. value
Saint Louis, MO 63103

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Region 9 Architect And Engineer Short Selection List
New Construction, Term Contract
Post-Bid
Milwaukee, WI

Last Updated 03/16/2023 03:10 PM
Project Title

Corridor Improvements Along I-70 From the Paseo to I-435

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63101   (Saint Louis City County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $140,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, a design team has been selected. Construction is expected in 2024. *The previous solicitation is listed below for reference Location: I-70 Proposed Improvement: Corridor Improvements along I-70 from The Paseo to I-435 Length: 5 Miles The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Corridor Improvements Along I-70 From the Paseo to I-435

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents