Similar Projects
Governors Office of Storm Recovery, Bowman Avenue Dam, Bowman Pond Clearing at Suny Purchase
Infrastructure
Bidding
$425,000 to $475,000 est. value
Purchase, Rye Brook, NY 10577

Precast Concrete Box Culvert for Farmersville Culvert No. 6
Infrastructure
Bidding
Little Valley, NY

Metropolitan Hospital Flood Wall Resiliency Project
Infrastructure
Sub-Bidding
New York, NY

Hydro Plant Canal Maintenance Project
Post-Bid
Watertown, NY 13601

Rehabilitation of the Steele Street Culvert
Post-Bid
Jamestown, NY 14701

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Rock Slope Remediation East Of Hudson
Term Contract, Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Hudson, Somers, NY 10589

Round Metal Corrugated Pipe and Pipe Arches
Post-Bid
NY

Vischer Ferry Retaining Wall Drain Installation
Results
Rexford, NY 12148

West Neck Farm Seawall Restoration
Infrastructure
Bidding
NY

Round Corrugated Plastic Pipe
Post-Bid
NY

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Catch Basin and Drainage Structure Cleaning Services
Term Contract
Bidding
New York, NY

Gabion Baskets
Post-Bid
NY

Last Updated 08/13/2021 02:54 PM
Project Title

New York State Office of Mental Health, Rockland Psychiatric Center, Drainage Improvements

Physical Address View project details and contacts
City, State (County) Orangeburg, NY 10962   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $210,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes the installation of temporary construction access roads, removing and reinstallation of existing perimeter fencing, installing and maintaining erosion and sediment control measures, bypass pumping of existing baseflows within the storm water system, small areas of clearing and grubbing trees/brush, removing and disposing of existing concrete headwalls, dewatering existing plunge pools, installation of new RCP pipe, end sections and cutoff walls in accordance with NYSDOT standards, installation of medium stone fill, and general site restoration such as top soil, seed and mulch.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents