Similar Projects
Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Pram Shed Replacement
New Construction - 1,360 SF
Bidding
$350,000 est. value
Dunedin, FL 34697

Fabrication and Installation of Precast Buildings for Polk County
New Construction, Term Contract
Bidding
Bartow, FL

JEA District II WRF Storage Building and Site Improvements
New Construction, Infrastructure - 5,340 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Jacksonville, FL 32218

Pre-Fabricated Metal Building at GTLWWTP Design Build
New Construction - 8,265 SF
Post-Bid
$1,300,000 est. value
Fort Lauderdale, FL 33316

Public Storage
New Construction - 111,393 SF
Post-Bid
$6,000,000 est. value
Bradenton, FL 34204

Manufacture and Delivery of Two Chemical Storage Buildings
Results
FL

Purchase of Chemical Storage Building
Results
Less than $75,000 est. value
Gainesville, FL 32609

Jensen Beach Auto Vault
New Construction - 231,075 SF
Construction
$2,999,998 est. value
Jensen Beach, FL 34957

Jetscape Westside Development
New Construction - 121,287 SF
Construction
$20,000,000 est. value
Fort Lauderdale, FL 33315

Pasco Maximus Self Storage
New Construction - 360,426 SF
Pending Verification
$10,000,000 CJ est. value
Zephyrhills, FL 33544

Timberline Mixed-Use Development - Master Plan
New Construction
Pending Verification
Daytona Beach, FL

Reported 02/02/2022 07:59 AM
Project Title

Public Storage - IRC West

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32966   (Indian River County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 30,620 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents