Similar Projects
US 71: Bridges Near St. Maurice
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Campti, LA 71411

US 71: Bridges Near St. Maurice
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Campti, LA 71411

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Resurfacing of Bermuda Road
Infrastructure
Post-Bid
Natchitoches, LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

Resurfacing Sam Sibley Drive Northwestern State University
Infrastructure
Results
LA

LA 119: Realign At Magnolia Plantation
Infrastructure
Design
$5,000,000 CJ est. value
Cloutierville, LA 71416

FY 2021-22 Phase 1 Street Rehabilitation
Infrastructure
Post-Bid
$750,000 to $1,500,000 est. value
Natchitoches, LA 71457

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

LA 1: LA 1-x to LA 6
Infrastructure
Design
$2,500,000 CJ est. value
Natchitoches, LA 71457

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

LA 6 : Install U-Turn Lanes West Of I-49
Infrastructure
Design
$5,000,000 CJ est. value
Natchitoches, LA 71457

Replacement of John S. Kyser Hall, Northwestern State University
New Construction, Infrastructure - 73,200 SF
Post-Bid
$30,340,000 CJ est. value
Natchitoches, LA 71457

Water Distribution and Production System Improvements; Powhatan Connection (Contract I, Water Well)
Infrastructure
Results
$370,693 CJ est. value
Natchitoches, LA 71457

Last Updated 03/01/2023 03:09 AM
Project Title

LA 6: US 171 to Natchitoches P.L.

Physical Address View project details and contacts
City, State (County) Robeline, LA 71469   (Natchitoches County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Mill and Overlay Length 11.55 miles Parish : Sabine Estimated Cost Range $5,000,000 to $7,500,000 As of March 01, 2023, the project is in Final Planning status. Anticipated letting date is June 14, 2023. LADOT - LA 6: US 171 to Natchitoches P.L. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents