Similar Projects
Municipal Waste Processing and Disposal
Term Contract
Post-Bid
Philadelphia, PA

Collection and Disposal of Solid Waste and Recycling Services at USCG District Nine (9) Bases and District (9) Housing Facilities Located in the Great Lakes Regions
Post-Bid

Recycling/Disposal Of Construction Debris/Waste
Results
Philadelphia, PA

Emergency Snow Removal 2018
Results
Philadelphia, PA

Demilitarization (Demil) of Government Information Technology (IT) property in the Continental United States (CONUS)
Post-Bid

Septic Waste Disposal-2 Year Contract
Term Contract
Results
$25,000 to $100,000 est. value
Philadelphia, PA

Secure Nontextual Disposal and Classified Destruction Services
Post-Bid
Perris, San Bruno, CA - Broomfield, CO - Ellenwood, GA - Chicago, Valmeyer, IL - Lenexa, KS - Pittsfield, Waltham, MA - Suitland, MD - Kansas City, Lees Summit, Saint Louis, MO - Dayton, OH - Philadelphia, PA - Fort Worth, TX - Seattle, WA

Snow Plowing
Results
$15,600 est. value
Philadelphia, PA

Solid Waste Removal Services
Term Contract
Post-Bid
Philadelphia, PA

Hill Creek Lot Cleaning
Results
Philadelphia, PA 19120

Snow Removal
Post-Bid
Philadelphia, PA 19102

S--VISN 4 Municipal Solid Waste Sources Sought Only
Results
Altoona, Butler, Coatesville, Erie, Lebanon, Philadelphia, Pittsburgh, Wilkes-Barre, PA

Four Year Contract to Provide Trash Removal Services
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Trash/Recylcing Combination Unit Per
Results
$25,000 to $100,000 est. value
Philadelphia, PA

TSA Nitrile Gloves Recycling and Disposal
Post-Bid

Last Updated 01/22/2019 04:08 PM
Project Title

Improvements To Hydrated Lime System at Baxter Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description For performing all demolition work, mechanical work, and structural work; for providing and installing all equipment and appurtenances for the lime system in accordance with the contract drawings and specifications, at Lump Sum. For furnishing all labor, equipment, and materials to perform all necessary work to provide complete control systems and panel, as specified under Sections 11950, 11951, and 11952, and as shown on the contract drawings, at Lump Sum. Electrical work including, but not limited to, providing and installing wiring, conduits, and connections to the MCC, remote panels for the six (6) vent dust collectors, lime slurry feed system control panels, etc., in accordance with the contract drawings and specifications, at Lump Sum. The contractor shall furnish all labor, equipment, and materials to perform all necessary work to provide miscellaneous electrical work associated with unforseen site conditions. The quantity and type of work shall be determined in the field and approved by the engineer in writing, at Lump Sum.
Details
Division 41 - Material Processing and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents