Similar Projects
Last Updated | 01/22/2019 04:08 PM |
Project Title | Improvements To Hydrated Lime System at Baxter Water Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA (Philadelphia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 to $4,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For performing all demolition work, mechanical work, and structural work; for providing and installing all equipment and appurtenances for the lime system in accordance with the contract drawings and specifications, at Lump Sum. For furnishing all labor, equipment, and materials to perform all necessary work to provide complete control systems and panel, as specified under Sections 11950, 11951, and 11952, and as shown on the contract drawings, at Lump Sum. Electrical work including, but not limited to, providing and installing wiring, conduits, and connections to the MCC, remote panels for the six (6) vent dust collectors, lime slurry feed system control panels, etc., in accordance with the contract drawings and specifications, at Lump Sum. The contractor shall furnish all labor, equipment, and materials to perform all necessary work to provide miscellaneous electrical work associated with unforseen site conditions. The quantity and type of work shall be determined in the field and approved by the engineer in writing, at Lump Sum. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |