Similar Projects
Water Valve Replacement
Infrastructure
Bidding
Rocky Mount, NC

Aviation Parkway Pump Station/Force Main Improvements
Renovation, Infrastructure
Bidding
$1,000,000 to $3,000,000 est. value
Cary, NC 27511

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

West Cameron Avenue Water Main Replacement - Phase 1
Post-Bid
$400,000 to $480,000 est. value
Carrboro, NC 27510

960 Zone North South Transmission Main, North Tryon Pressure Zone Boundary Change, Idlewild Booster Pump Station Supply Main, and Airport Area Transmission Main Projects
Results
Charlotte, NC

Cates Avenue Water, Steam and Condensate Replacement
Results
Less than $1,100,000 est. value
Raleigh, NC

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

Water Utility Customer Portal
Infrastructure
Bidding
Monroe, NC

Open End Construction and Repair Service Contract
Term Contract
Post-Bid
Rocky Mount, NC

Bladen County Water District - Phase IV, Contract 3 - Water Meter Replacement Project
Results
NC

Industrial Park Water Line Extension
Infrastructure
Bidding
New Bern, NC

Replace Steam and Condensate Lines Between Steam Pits 39 and 40
Post-Bid
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

Forest Oaks Loop Water Line Extension
Results
Greensboro, NC

Water System Improvements
Infrastructure
Bidding
NC

Terrible Creek WWTP Vacuum Truck Unloading Station Project
Post-Bid
Fuquay-Varina, NC

Last Updated 11/01/2021 04:24 PM
Project Title

Water Main Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $762,423
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the replacement and/or rehabilitation of the following Base Bid and Contingency Item reaches: 1. Cured-in-place pipe (CIPP) renewal and replacement of 8-inch Water Main on Howell Street from Perkins Street to Beatty Street (approximately 2,000 linear feet, lf) – Base Bid 2. CIPP renewal and replacement of 6-inch Water Main along West 4th Street from South Pitt Street to just east of a railroad crossing (approximately 690 lf) – Base Bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents