Similar Projects
Last Updated | 03/27/2020 08:31 AM |
Project Title | I-70 and Kipling North Phase Safety and Operations Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | CO (Jefferson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | I-70 and Kipling North Phase Safety and Operations Improvement Project. Located In Jefferson County. Work includes Placing Embankment to Widen The i-70 West Bound Off Ramp for an Additional Right Turn Lane, Minor Widening and Flat Work at w. 50th & Kipling, Installation Of Eight (8) Traffic Signals, and Signing & Striping. Major Items 202-00155 Removal of Wall 157.000 LF 202-04002 Clean Culvert 16.000 EACH 203-00060 Embankment Material (Complete In Place) 1,732.000 CY 214-00000 Landscape Maintenance 1.000 L S 304-06000 Aggregate Base Course (Class 6) 687.000 TON 403-00720 Hot Mix Asphalt (Patching) (Asphalt) 184.000 TON 403-33841 Hot Mix Asphalt (Grading S) (100) (PG 64-22) 193.000 TON 403-34871 Hot Mix Asphalt (Grading SX) (100) (PG 76-28) 56.000 TON 411-10255 Emulsified Asphalt (Slow-Setting) 111.000 GAL 412-01050 Concrete Pavement (10-1/2 Inch) 661.000 SY 412-01120 Concrete Pavement (11 Inch) (Fast Track) 168.000 SY 503-00018 Drilled Shaft (18 Inch) 20.000 LF 503-00036 Drilled Shaft (36 Inch) 152.000 LF 606-00301 Guardrail Type 3 (6-3 Post Spacing) 290.000 LF |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |