Similar Projects
Douglas Avenue Improvements - City of Roseburg
Infrastructure
Conception
$700,000 CJ est. value
Roseburg, OR 97470

Douglas Avenue Improvements - City of Roseburg
Infrastructure
Conception
$700,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

Rice Creek Bridge (19C211) Replacement Willis Creek Rd.
Infrastructure
Bidding
$5,000,000 CJ est. value
Roseburg, OR 97470

Rice Creek Bridge (19C211) Replacement Willis Creek Rd.
Infrastructure
Bidding
$5,000,000 CJ est. value
Roseburg, OR 97470

Arthur Drive Reconstruction
Infrastructure
Post-Bid
Reedsport, OR

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

Pruner Road Intersection Improvements
Infrastructure
Results
$2,000,000 est. value
Roseburg, OR

Everett and State Roadway Improvements
Infrastructure
Results
$331,000 est. value
Sutherlin, OR

SE Lane Avenue and Jackson Street Mixed-Use
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Roseburg, OR 97470

SE Lane Avenue and Jackson Street Mixed-Use
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Roseburg, OR 97470

Douglas Avenue Water Main Replacement - City of Roseburg
Infrastructure
Conception
$900,000 CJ est. value
Roseburg, OR 97470

I-5: Azalea - Glendale (Southbound)
Infrastructure
Design
$4,902,000 CJ est. value
Roseburg, OR 97470

Region 3 HQ Construct New Mat Lab Building
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Roseburg, OR 97470

Last Updated 11/04/2022 01:38 AM
Project Title

Taxiway A Extension - City of Roseburg

Physical Address View project details and contacts
City, State (County) Roseburg, OR 97470   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The runway was extended by 400 feet in 2009/10 utilizing a ConnectOregon 3 Grant. Due to funding constraints, the parallel taxiway was not constructed. The proposed project will extend the taxiway 400 feet to eliminate the back taxi required on Runway 16. The extended runway length was justified as part of the 2019 Airport Master Plan update and is eligible for FAA funding. This project is in included in the City's or County's FY 2021-2026 Capital Improvement Plan (CIP). As of November 04, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents