Similar Projects
Last Updated | 09/17/2020 11:57 AM |
Project Title | Magnolia Circle Drainage Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Longmeadow, MA (Hampden County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $170,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of: the replacement of existing drain pipe with approximately 500 linear feet (LF) of 12-inch to 30-inch diameter drain pipe, including 5 catch basins, installation of one new drain manhole, and construction of a gravel access road for maintenance activities. Portions of the existing drain pipes are located in and off of the road on Magnolia Circle, and along an easement toward Longmeadow Brook. The Town intends for utility work and paving repair to be completed prior to a Winter 2020 shutdown, with site restoration to be completed in Spring 2021, if necessary. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |