Similar Projects
Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Bidding
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

North & South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Pump Stations 19 and 31 Upgrades Special Inspection and Testing Services
Renovation, Infrastructure
Post-Bid
$4,750,000 est. value
Silverdale, WA

Richmond Beach Pump Station Low Voltage Switchboard and Mcc Replacement
Alteration
Bidding
$2,558,000 est. value
WA

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

51st Circle Generator Purchase and Installation
Alteration
Post-Bid
$500,000 to $550,000 est. value
Vancouver, WA 98661

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Vehicle Gate Electrical Power
Alteration
Results
Vancouver, WA 98661

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration
Post-Bid
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Woods Creek - Circuits 12-1808 & 12-1811 - Distribution and Transmission Line Clearance
Infrastructure
Bidding
$900,000 est. value
Monroe, WA 98272

115Kv Transmission Steel Poles and Caissons for North Stanwood Camano Island Project
Infrastructure
Bidding
Stanwood, WA 98292

Deception Creek Line Extension
Infrastructure
Bidding
$2,235,825 est. value
WA

Last Updated 09/02/2021 12:32 PM
Project Title

Lakeland Hills Pump Station Generator Install

Physical Address View project details and contacts
City, State (County) Auburn, WA 98092   (King County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brief Scope: The purpose of this project is to upgrade the electrical system at the wastewater pump station and add a permanent standby generator inside the existing building. Modifying the existing building to accommodate the generator will require seismic upgrades consisting of thickening the walls, widening the footings, and reinforcing the roof.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 40 - Process Integration, Water Process Piping.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents