Similar Projects
CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Bidding
$828,757 est. value
Ontario, CA 91761

Ac Overlay Phase Two
Infrastructure
Bidding
$7,700,000 est. value
Sacramento, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Reconstruct and Line Culverts, and Replace Invert Concrete Paving
Infrastructure
Bidding
$7,000,000 est. value
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

Cold plane AC, overlay with OGFC and apply HFST - 12-Ora-5-30.3/31.4
Infrastructure
Bidding
$5,700,000 est. value
CA

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Last Updated 12/10/2021 05:10 PM
Project Title

5th Street Rehabilitation

Physical Address View project details and contacts
City, State (County) Marysville, CA   (Yuba County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,697,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the rehabilitation of 5th Street between J Street and E Street. The rehabilitation consists of the following: Variable Depth AC Grinding. Two lift overlay of existing road surface. Installation of curb & gutter, parkway strip, sidewalk, driveways, and ADA compliant curb ramps. Installation of landscaping and landscaping irrigation. Storm drain inlet and pipe installations. Installation of new striping. Installation of new signal system, RRFB pedestrian crossing, and decorative street lights.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents