Similar Projects
Jackson Woods Southeast
New Construction
Conception
Jackson, NJ 08527

Ohr Chaim Meir High School
New Construction
Conception
Lakewood, NJ 08701

The General's Retreat
New Construction, Renovation - 6,226 SF
Design
Lambertville, NJ 08530

The Halo
New Construction - 1,171,142 SF
Design
$10,000,000 CJ est. value
Newark, NJ 07102

Aquatics Rehabilitation and Maintenance Services
Post-Bid
Jersey City, NJ

Renovation to the Verona Community Pool
Renovation
Post-Bid
Verona, NJ 07044

Swimming Pool Renovation at Phillipsburg Elementary School
Results
Phillipsburg, NJ 08865

Orange Park Pool Renovation
Results
Irvington, NJ 07111

Autumn Park at Medford
New Construction - 2,984,000 SF
Construction
$10,000,000 CJ est. value
Medford, NJ 08055

The Reserve at Crosswicks
New Construction
Construction
Bordentown, NJ 08505

The Ridge at Readington
New Construction, Renovation
Conception
NJ 08888

Jackson Parke Phases I-V
New Construction - 6,137 SF
Design
Jackson, NJ 08527

Pool Management Operations
Post-Bid
Somerville, NJ 08807

Bee Meadow Pool Dual Flume Slide
Results
$54,275 est. value
Hanover, NJ

The Reef Luxury Condominums
New Construction
Construction
$2,500,000 est. value
Long Branch, NJ 07740

Last Updated 07/20/2021 01:27 PM
Project Title

Seasonal Opening, Closing and Winterization, Chlorine and Chemical Delivery, and Repairs

Physical Address View project details and contacts
City, State (County) Franklin Township, Warren, NJ 07059   (Somerset County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Warrenbrook Pool: Pool Opening: Remove plugs from skimmers, prime filters, pumps, chemical delivery system, start filtration system on waste cycle and run for 15 minutes, turn system off, switch filter cycle and turn system on, ensure all systems are functioning properly Pool Closing: Backwash filtration system, blow out all skimmer lines, empty main and return lines, fill all appropriate lines with anti-freeze and secure for winter, apply skimmer plugs, shut down and secure all mechanical systems; Colonial Park Spray Park: Spray Park Opening: Remove plugs from skimmers, prime filters, pumps, chemical delivery system, start filtration system on waste cycle and run for 15 minutes, turn system off, switch filter cycle and turn system on, ensure all systems are functioning properly as outlined in Attachment A. Spray Park Closing and Winterization: Backwash filtration system, blow out all feature supply lines, empty main and return lines, fill all appropriate lines with anti-freeze and secure for winter, shut down and secure all mechanical system, follow directions to winterize the Vak Pak remote collector tank, equipment cabinet, and remote drain box as outline in Attachment B, the Vacuum Vartridge filter system as outlined in Attachment C, and the Water Odyssey spray park features as outlined in Attachment D.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents