Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Water Heater Replacement at Indian Hills (IL 16-1)
Renovation
Sub-Bidding
$3,000 CJ est. value
Quincy, IL 62301

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 ESC - HVAC Equipment Pre-Purchase
Alteration
Post-Bid
Skokie, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

Adams County Health Department HVAC Replacement
Alteration
Post-Bid
Quincy, IL 62301

2021 Pool RTU Replacement
Alteration
Results
Streamwood, IL 60107

Last Updated 04/10/2023 02:09 PM
Project Title

Cafeteria, Kitchen and Auditorium HVAC Improvements

Physical Address View project details and contacts
City, State (County) Camp Point, IL 62320   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Description of work: General contractor work includes removal of the existing cafeteria ceiling, structural modifications for the new rooftop units, installation of a new cafeteria ceiling, roofing, and a concrete pad for a grade mounted roof top unit. Plumbing work includes new gas piping and condensate piping. HVAC work includes a new grade mounted rooftop unit, two new roof mounted roof top units, one new split system, new ductwork, new refrigerant piping and HVAC controls. Electrical work includes shifting some existing circuits to another, nearby, existing panelboard, power for the new HVAC equipment and replacement of the cafeteria lights. . The Central CUSD #3 reserves the right to reject any or all proposals and to waive technicalities and reserves the right to determine the qualifications of any and all contractors to perform the work required under this contract

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents