Similar Projects
Last Updated | 09/29/2022 09:09 AM |
Project Title | Lake to Sound Trail - Segment C SeaTac - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Seatac, WA 98188 (King County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2022 |
Bids Due | View project details and contacts |
Estimated Value | $6,857,857 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project provides for the improvement of a shared use path, which runs from S 200th Street in the City of SeaTac to 8th Avenue S/Des Moines Memorial Drive Intersection in the City of Burien. Work includes, but not limited to, construction of approximately 1.8 miles of 10- to 12 foot-wide paved trail with gravel shoulders, 800-feet of elevated boardwalk structure, curb and gutter, stormwater BMPs, stormwater conveyance system, culvert, soldier pile wall and structural earth wall, concrete driveway crossings, erosion control, site preparation, grading, traffic control, utility adjustments/relocation, roadway channelization striping, signal equipment relocation, and wetland mitigation planting. Last Date for Questions 11/25/21 11:00:00 PM |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |