Similar Projects
SR 135 From Florida State Line to Lowndes County Line
Infrastructure
Design
$2,000,000 CJ est. value
Lake Park, GA 31636

James Road Subdivision
New Construction, Infrastructure
Design
$94,300,000 CJ est. value
Valdosta, GA 31601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Widening, Leveling and Resurfacing Improvements to J Frank Culpepper Road
Infrastructure
Bidding
$60,000 CJ est. value
Lake Park, GA 31636

Exit 22 Watermain Extension
Infrastructure
Post-Bid
GA

Moulton Branch Elementar (MBE) Main Water Tie In
Infrastructure
Post-Bid
$200,000 est. value
Valdosta, GA 31601

Rebid New Clyattville Community Center
New Construction, Infrastructure
Results
$560,465 CJ est. value
Clyattville, GA 31601

A New Headquarters for Second Harvest of South Georgia
New Construction, Infrastructure - 85,018 SF
Results
$24,565,000 CJ est. value
Valdosta, GA 31602

South Georgia Medical Center Campus Expansion
Addition, Demolition, Renovation, Infrastructure - 125,000 SF
Pending Verification
$125,000,000 CJ est. value
Valdosta, GA 31602

Forrest Street Townhomes
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Valdosta, GA 31605

I-75 From Florida State Line to Cook County Line
Infrastructure
Design
$1,000,000 CJ est. value
Valdosta, GA 31601

Brookridge Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Hahira, GA 31632

Manhole Improvements
Infrastructure
Post-Bid
$70,000 CJ est. value
Valdosta, GA 31601

An Addition to Board Office Lowndes Board of Education
New Construction, Infrastructure - 10,000 SF
Results
$2,871,216 CJ est. value
Valdosta, GA 31601

Brookridge Drive - Grading, Drainage, Base and Paving
Infrastructure
Bidding
$300,000 CJ est. value
Hahira, GA 31632

Last Updated 03/21/2023 06:34 PM
Project Title

Storm Drainage Improvements to Serve Woodbridge Subdivision

Physical Address View project details and contacts
City, State (County) Hahira, GA 31632   (Lowndes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. Contractor License: Any Contractor performing the proposed work must be a licensed contractor by the State of Georgia. License numbers are requested to be written on the face of the bid envelope, but not required. See Instructions to Bidders for additional bidding requirements. Work To Be Done: The Work To Be Done shall consist of furnishing all products and performing all labor necessary to construct the Storm Drainage Improvements to Serve Woodbridge Subdivision including +/-2,028 linear feet of 36" RCP, and +/- 610 linear feet of 30" RCP, drainage structures, erosion control and grassing, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. The work will be awarded in one (1) contract with a contract time of 180 consecutive calendar days. Bonds: All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Permits: All necessary permits for this project are expected to be acquired prior to construction. Land/Easement Acquisition: No land acquisition is expected to be required for this project. Funding: This project is funded in whole or in part with American Rescue Plan Act funds passed through the Governor's Office of Planning & Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. This project will be required to comply with applicable Federal requirements including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal requirements are included in the contract documents. The Owner reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents