Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Sewer Lining and Utility Improvements
Infrastructure
Results
$500,000 est. value
Luverne, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Construction of the Ellis and Eastern, Rail Junction
Infrastructure
Post-Bid
$250,000 CJ est. value
Beaver Creek, MN 56116

Luverne Loop Trail - Phase 3B and 4
Infrastructure
Results
$1,100,000 est. value
Luverne, MN

Rock County Highway Work
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Luverne, MN 56156

Dakota Road Extension
Infrastructure
Results
$900,000 est. value
Luverne, MN

Construction of Bridge 67576
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Luverne, MN 56156

Schmuck Addition Utility Extension
Infrastructure
Results
$240,000 est. value
Luverne, MN

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

Bituminous Seal Coat
Infrastructure
Results
$700,000 est. value

Public Works Parking Lot Improvements
Infrastructure
Results
$610,000 est. value
Luverne, MN 56156

PrairiE Loft Apartments Parking Lot Paving
Infrastructure
Results
$415,000 est. value
Luverne, MN

Rock County Rural Water District - Well No. 15
Infrastructure
Results
$332,385 CJ est. value
Luverne, MN 56156

Last Updated 06/08/2023 04:09 AM
Project Title

Sybesma Subdivision Connection to the Luverne Loop

Physical Address View project details and contacts
City, State (County) Luverne, MN 56156   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate quantities of work on which proposals will be received are as follows: 8,036 S.F. PCC Sidewalk (Thickness varies); 140 S.Y. Concrete Pavement; 106 L.F. Storm Sewer, Varies Sizes; 1 Ea. Storm Structure; 400 C.Y. Common Borrow; 400 C.Y. Topsoil, On-Site and other related items of construction. Est. Completion Date: Sept. 16, 2023 The work covered by this Section of the Project Manual shall include furnishing all horizontal alignment and vertical elevations by the Engineer necessary to complete the installation of manholes, sanitary sewer, storm sewer, water main and street paving. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents