Similar Projects
Replace Building 204 Roof - Phase 2
Term Contract
Design
$1,000,000 to $2,000,000 est. value
Johnson City, TN 37604

Pigeon Forge Junior High Gym and Sevier County High Fieldhouse ReRoofing 2022
Alteration
Bidding
$700,000 est. value
Pigeon Forge, TN

Roof Replacement Services at the Chance Girls Home
Infrastructure
Bidding
$585,000 est. value
Bloomington Springs, TN 38545

Roofing Repair and Maintenance
Post-Bid

Roofing Repair and Maintenance
Post-Bid

Replacement Roofing System For Fire Station #1
Results
Chattanooga, TN 37400

3505 Tchulahoma Road Roof Replacement
Renovation
Results
Memphis, TN 38118

Partial Reroofing of Daniel Boone High School
Post-Bid
Gray, TN 37615

UT Martin Somerville Center Roof Removal & Replacement
Renovation
Results
$70,000 est. value
Somerville, TN 38068

Replace Roof on Sixth Street Press Box
Post-Bid
Etowah, TN 37331

Re Roofing of Harriman City Municipal Plaza
Results
Harriman, TN 37748

Reroofing of Maryville Junior High School
Post-Bid
Maryville, TN 37803

Whitwell High School Roofing
Results
Whitwell, TN 37397

Roof Repairs Summit Softball Complex
Post-Bid
Collegedale, TN 37363

Roane County Courthouse Re-Roof
Renovation
Results
Kingston, TN 37763

Last Updated 05/04/2022 07:29 AM
Project Title

Newport Grammar School Partial Roof Replacement - Phase III

Physical Address View project details and contacts
City, State (County) Newport, TN 37821   (Cocke County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Primary Building (Roof Area “A”,“B”,“C”, & “D”) and Gymnasium Stage (Roof Area “F”)(Approximately 40,553 SF):The work shall include the removal of the existing EPDM membrane roof to the existing roof insulation substrate (salvage existing insulation) and overlaying the existing insulation substrate with a new high density insulation coverboard. The roof insulation assembly is to be mechanically attached to the existing steel decking and the new roof system shall be a 20-year fully adhered .060" EPDM roof membrane system including roof accessories and miscellaneous sheet metal fabrications. Existing coping and overflow scuppers shall be salvaged and be reused in the new roof system. Additional work includes painting of rooftop equipment and refurbishment of existing roof drain bowls/strainers as indicated on the drawings. Gymnasium(Roof Area “E”) (Approximately 10,050 SF):The work shall include the removal of the existing EPDM membrane roof system to the existing roof deck and replacement thereof with a 20-year fully adhered .060" EPDM roof membrane system with tapered insulation, coverboards, roof crickets, roof accessories, and miscellaneous sheet metal fabrications. Existing coping and overflow scuppers shall be salvaged and be reused in the new roof system. Additional work includes painting of rooftop equipment and refurbishment of existing roof drain bowls/strainers as indicated on the drawings.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents