Similar Projects
Replacement of Water Mains - Old Farm Hill Water District Phase 3
Term Contract, Infrastructure
Bidding
$200,000 CJ est. value
Valhalla, NY 10595

Plumbing Maintenance and Repair Service
Term Contract
Post-Bid
Scarsdale, Yonkers, NY 10701

General, Electrical, Plumbing, Building & Yard Emergency Services At LNA Service Stations
Term Contract
Post-Bid

Repair/Replace Leaking Sanitary Line, Building 81 - Plumbing
Alteration
Results
$250,000 to $500,000 est. value
Bedford Hills, NY 10507

2022 Bid for Licensed HVAC/Plumbing Services
Alteration
Results
Ardsley, Hartsdale, White Plains, NY 10607

Periodic Plumbing Repair, Installation and Upgrade Services
Alteration
Post-Bid
Pleasantville, NY

Provide Latrines and Locker Rooms - Plumbing Work
Renovation
Results
$387,000 CJ est. value
Peekskill, NY 10566

Plumbing 2022-23
Term Contract
Post-Bid
Valhalla, NY

New DPW Project - Plumbing Construction (PC)
Alteration
Post-Bid
$300,000 est. value
Ardsley, NY 10502

Plumbing Repair Services
Alteration
Post-Bid
Dobbs Ferry, NY

Contract No. PC-05 - Plumbing Work at New Rochelle High School - Utilities Building
Term Contract
Post-Bid
$250,000 est. value
New Rochelle, NY 10801

Plumbing Services
Term Contract
Post-Bid
Harrison, NY

Plumbing Repair Services
Alteration
Post-Bid
Hastings-on-Hudson, NY

On-Call Plumbing Service
Alteration
Post-Bid
Yonkers, NY

2022-23 Districtwide Contracts - Plumbing
Alteration
Post-Bid
Irvington, NY

Last Updated 06/24/2023 11:32 AM
Project Title

Outfall Jetty Rehabilitation Mamaroneck Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Mamaroneck, NY 10543   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $6,058,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000316873 The work under this contract consists of providing all necessary labor, material and equipment required to construct a new steel sheet pile bulkhead around the existing effluent Outfall Jetty, located within the Village of Mamaroneck's Harbor Island Park. The new steel sheet pile bulkhead, using marine grade steel, will be constructed to the same finished elevation as the existing steel bulkhead and approximately 2' feet to the waterside of the existing steel bulkhead. Some portions of the new bulkhead will be constructed using stone revetment to the waterside of the existing bulkhead in areas where the new steel sheet piling is not being installed. A new concrete pile cap will be constructed on top of the new steel sheet piling which will also serve as a foundation for a new perimeter fence. In addition, pervious pavement walkways, decorative lighting, benches, fencing, and grass areas will be installed on the surface area of the rehabilitated jetty (Bid range: $6,400,000.00 to $7,000,000.00). Filling the annular space between the new and existing steel sheet pile bulkheads with 3/4 " crushed stone. o Constructing stone revetment waterward of the existing bulkhead in areas where new steel sheet piling is not being installed. o Installing a concrete pile cap on top of the new steel sheet piling which will also serve as a foundation for a new perimeter fence. o Installing pervious pavement walkways, decorative lighting, benches, fencing, grass areas and planting beds on top of the rehabilitated jetty. General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Contact Information John Coelho 914-995-5144 jjcb@westchestergov.com Completion- 730 consecutive calendar days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents