Similar Projects
East Harlem Waterfront Park - Economic Development Corporation
New Construction
Conception
$101,000,000 est. value
New York, NY 10027

West 57th Street Office Development
Demolition, New Construction, Infrastructure - 260,000 SF
Design
$350,000,000 CJ est. value
New York, NY 10007

New York Blood Center - Center East Development
Demolition, New Construction, Infrastructure - 527,000 SF
Design
$750,000,000 CJ est. value
New York, NY 10065

RFP D/B - Comprehensive Modernization Design and Construction Services St Nicholas Houses (Man)
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
New York, NY 10007

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Vesey Street Reconstruction
Infrastructure
Results
New York, NY

Installation of Sidewalks, Adjacent Curbs and Ped Ramps
Infrastructure
Results
$70,000 est. value
New York, NY

Class A Medical Office Building/ Manhattan
New Construction, Infrastructure - 400,000 SF
Construction
$230,000,000 CJ est. value
New York, NY 10075

Reconstruction of Randalls Island Ramps
New Construction, Infrastructure
Construction
$108,173,500 CJ est. value
New York, NY 10007

Madison Avenue Office Tower / Manhattan
New Construction, Infrastructure - 343,100 SF
Pending Verification
$70,000,000 CJ est. value
New York, NY 10017

Penn Station Megadevelopment
Demolition, New Construction, Infrastructure - 18,000,000 SF
Pending Verification
$5,000,000,000 CJ est. value
New York, NY 10001

Fourth Avenue Mixed-use Building
Demolition, New Construction, Infrastructure - 6,312 SF
Design
$2,000,000 CJ est. value
Brooklyn, NY 11217

Repair, Replacement and Relocation of Fire Standpipe
Term Contract, Infrastructure
Post-Bid
New York, NY

Fire Hydrant
Infrastructure
Results
New York, NY

Last Updated 04/26/2023 07:06 AM
Project Title

Brooklyn Green Infrastructure Construction

Physical Address View project details and contacts
City, State (County) Brooklyn, NY 11216   (Kings County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,292,910 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This procurement is subject to: Participation goals for MBEs and/or WBEs as required by Local Law 1 of 2013 The Cost Estimate Range is: $1,000,000.00 to $3,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents