Similar Projects
Electric Construction Renovation
Renovation
Results
Statesboro, GA

Amazon
New Construction - 2,250,000 SF
Conception
$10,000,000 CJ est. value
Appling, GA 30802

Crow Holdings Industrial - Shell Building
New Construction
Post-Bid
McDonough, GA 30253

The Savannah Portside International Park - Building B
New Construction
Construction
Garden City, GA 31408

High Falls Logistics Park
New Construction
Pending Verification
$1,500,000 est. value
Griffin, GA 30224

Procurement Services and Distribution
New Construction - 58,815 SF
Post-Bid
Cumming, GA 30040

2021 Industrial Building
New Construction - 100,000 SF
Post-Bid
Valdosta, GA

The Savannah Portside International Park - Building A
New Construction - 518,000 SF
Construction
$10,000,000 CJ est. value
Garden City, GA

Kennesaw Crossing Storage
New Construction - 138,000 SF
Conception
$15,000,000 est. value
Kennesaw, GA 30144

Vista Ridge Distribution Center
New Construction
Pending Verification
Suwanee, GA 30024

Irving Tissue a/k/a Project Tiger2 - Phase II
New Construction
Pending Verification
$400,000,000 est. value
Macon, GA 31216

Stanton Springs
New Construction
Conception
Monroe, GA

Warehouse
New Construction - 686,000 SF
Design
$10,000,000 CJ est. value
Palmetto, GA 30268

Greenwood Industrial Park - Lot 900
New Construction
Pending Verification
McDonough, GA 30253

Terex
New Construction - 20,950 SF
Construction
$1,800,000 est. value
Fairburn, GA

Reported 06/14/2022 01:27 PM
Project Title

Project Whiplash

Physical Address View project details and contacts
City, State (County) Dacula, GA 30019   (Gwinnett County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected June 2022, Construction Completion Expected June 2023
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 600,000 square feet of industrial warehouse space. As of January 3, 2022, this project is in planning and under review by the Georgia Department of Community Affairs. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed, but construction could begin in summer 2022 and be complete in summer 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Industrial Warehouse, 238,700 SF New Construction, Industrial Warehouse, 130,200 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents