Similar Projects
(3.00-Mile) Smart Overlay and Ada Improvements on Virginia St/Northwest Hwy from Crystal Lake Av to Pingree Rd
Infrastructure
Bidding
Crystal Lake, IL

2022 Parking Lot Resurfacing Improvements
Infrastructure
Bidding
Cary, IL

Knox Park Parking Lot Rehabilitation
Infrastructure
Post-Bid
McHenry, IL

Downtown Paver Brick Maintenance and Replacement
Results
Bull Valley, Woodstock, IL 60098

Union Pacific/Cary Maintenance Garage Site Preparation Improvements
Renovation
Results
Cary, IL 60013

Driveway Apron Repairs
Results
Lake in the Hills, IL 60156

Spoerl Park Parking Lot Improvements
Results
Crystal Lake, IL 60061

Sidewalk Improvements Including ADA Ramp Installation
Results
Johnsburg, IL 60051

ADA Improvement Project along Various State Maintained Routes
Results
Fox Lake, Grayslake, Lake Villa, Richmond, Winthrop Harbor, IL

Ada Improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will
Results
Barrington, Lockport, Wauconda, IL

2021 Parking Lot Replacements
Results
Lake in the Hills, IL

Roadway Resurfacing
Results
Less than $5,153,802 est. value
Woodstock, IL

Parking Lot Sealcoating
Term Contract
Results
Algonquin, IL

2021 Parking Lot Maintenance
Results
Woodstock, IL 60098

Bike Path from East of Illinois Route 31 into the Park
Results
Cary, IL

Last Updated 01/13/2022 11:31 AM
Project Title

2022 Asphalt Parking Lot and Bike Path

Physical Address View project details and contacts
City, State (County) Lake in the Hills, IL 60156   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location 1: Sunset Park Parking Lot Replacement (5200 Miller Road). Furnish all labor, machinery, tools, materials, and equipment necessary to replace the existing portion of the asphalt parking lot (approximately 71,400 total square feet). Location 2: Sunset Park Bike Path Replacement (5200 Miller Road). Furnish all labor, machinery, tools, materials, and equipment necessary to replace and widen (from a width of 8 feet to a width of 12 feet) the existing portion of the asphalt bike path (approximately 710 linear feet). Location 3: Reed Road Bike Path Overlay. Furnish all labor, machinery, tools, materials, and equipment necessary to resurface one section of bike path via asphalt overlay within the specified time frame and in a professional manner. The total length for the section of bike path is approximately 2,080 linear feet and 8 feet wide. Location 4: Bark Park Parking Lot Replacement (9027 Haligus Road). Furnish all labor, machinery, tools, materials, and equipment necessary to replace the existing parking lot within the specified time frame and in a professional manner. The total sq. ft. for the parking lot is approximately 9,900 sq. ft. and must be field verified for accuracy. T

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents