Similar Projects
Shadow Creek Ranch Sidewalk Extension Project
Infrastructure
Bidding
Pearland, TX

Construction of Hike and Bike Trails at Cypress Creek Greenway for Harris County Precinct 4
Infrastructure
Bidding
Houston, TX

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$10,750,000 to $11,100,000 est. value
Houston, TX 77074

Renovation of the Johnson County Burleson Sub-Courthouse Parking Lot
Results
$250,000 est. value
Burleson, TX 76028

Sidewalk Improvements 2019
Results
Terrell, TX 75160

P32 Parking Lot
Post-Bid
Stephenville, TX

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

RM 12/FM 2439 Intersection Improvements
Results
$472,267 est. value
San Marcos, TX 78666

Campus Sidewalks and Road Repairs
Infrastructure
Post-Bid
Gainesville, TX

City of Copperas Cove - The Narrows Sidewalks
Results
Less than $1,640,000 est. value
Temple, TX 76522

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Barbara Drive Drainage Phase 2
Results
Less than $5,852,000 est. value
San Antonio, TX 78200

Construction of New Parking Lot at the Michael Talbott Service Center
Results
Less than $555,400 est. value
Houston, TX 77002

Last Updated 09/04/2021 03:03 AM
Project Title

SH 358 - Construct Pedestrian Infrastructure

Physical Address View project details and contacts
City, State (County) TX   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,950,635
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6009 Removing Conc (Riprap) Sy 20.000 1 104 6011 Removing Conc (Medians) Sy 12.000 2 104 6017 Removing Conc (Driveways) Sy 3,390.000 3 104 6029 Removing Conc (Curb Or Curb & Gutter) Lf 3,544.000 4 104 6036 Removing Conc (Sidewalk Or Ramp) Sy 282.000 5 104 6044 Removing Conc (Flume) Sy 2.000 6 105 6037 Removing Stab Base And Asph Pav(0"-16") Sy 2,041.000 7 110 6003 Excavation (Special) Cy 660.000 8 132 6003 Embankment (Final)(Ord Comp)(Ty B) Cy 295.000 9 160 6003 Furnishing And Placing Topsoil (4") Sy 2,344.000 10 161 6022 General Use Compost (4") Sy 21.000 11 162 6002 Block Sodding Sy 2,344.000 12 162 6004 Mulch Sodding Sy 21.000 13 168 6001 Vegetative Watering Mg 41.300 14 340 6247 D-Gr Hma (Sq) Ty-D Pg 70-22(Level-Up) Ton 163.600 15 340 6272 Tack Coat Gal 117.000 16 354 6002 Plan & Text Asph Conc Pav(0" To 2") Sy 1,469.000 17 400 6008 Cut & Restore Asph Paving Sy 1,305.000 18 420 6002 Cl A Conc (Misc) Cy 20.000 19 420 6007 Cl A Conc (Flume) Cy 1.000 20 450 6051 Rail (Handrail)(Ty E) Lf 72.000 21 471 6003 Grate & Frame Ea 9.000 22 479 6005 Adjusting Manholes (Water Valve Box) Ea 2.000 23 496 6040 Remov Str (Ret Wall) Lf 63.000 24 496 6043 Remov Str (Small Fence) Lf 83.000 25 496 6099 Remove Str (Rail) Lf 19.000 26 500 6001 Mobilization Ls 1.000 27 502 6001 Barricades, Signs And Traffic Handling Mo 17.000 28 506 6035 Sandbags For Erosion Control Ea 2,060.000 29 506 6038 Temp Sedmt Cont Fence (Install) Lf 2,060.000 30 506 6039 Temp Sedmt Cont Fence (Remove) Lf 2,060.000 31 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 2,060.000 32 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 8,590.000 33 528 6006 Remove And Relay Pavers Sy 16.000 34 529 6002 Conc Curb (Ty Ii) Lf 968.000 35 529 6007 Conc Curb & Gutter (Ty I) Lf 3,392.000 36 529 6008 Conc Curb & Gutter (Ty Ii) Lf 2,113.000 37 530 6004 Driveways (Conc) Sy 3,317.000 38 531 6001 Conc Sidewalks (4") Sy 4,448.000 39 531 6002 Conc Sidewalks (5") Sy 289.000 40 531 6018 Curb Ramps (Ty 1) Sy 812.000 41 531 6019 Curb Ramps (Ty 2) Sy 128.000 42 531 6020 Curb Ramps (Ty 3) Sy 517.000 43 531 6022 Curb Ramps (Ty 5) Sy 14.000 44 531 6023 Curb Ramps (Ty 6) Sy 69.000 45 531 6024 Curb Ramps (Ty 7) Sy 578.000 46 531 6029 Curb Ramps (Ty 20) Sy 73.000 47 531 6030 Curb Ramps (Ty 21) Sy 120.000 48 531 6031 Curb Ramps (Ty 22) Sy 249.000 49 531 6033 Conc Sidewalks (Special) (Type B) Sy 61.000 50 531 6050 Concrete Sidewalk (Steps) Sy 5.000 51 536 6004 Conc Directional Island Sy 1,066.000 52 618 6023 Condt (Pvc) (Sch 40) (2") Lf 688.000 53 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 172.000 54 618 6046 Condt (Pvc) (Sch 80) (2") Lf 57.000 55 620 6007 Elec Condr (No.8) Bare Lf 276.000 56 624 6009 Ground Box Ty D (162922) Ea 9.000 57 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 1.000 58 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(P) Ea 5.000 59 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 18.000 60 666 6224 Pavement Sealer 4" Lf 157.000 61 666 6226 Pavement Sealer 8" Lf 4,505.000 62 666 6228 Pavement Sealer 12" Lf 837.000 63 666 6230 Pavement Sealer 24" Lf 10,196.000 64 666 6243 Pavement Sealer (Yld Tri) Ea 27.000 65 668 6061 Prefab Pav Mrk Ty C (W) (4") (Brk) Lf 157.000 66 668 6072 Prefab Pav Mrk Ty C (W) (8") (Sld) Lf 4,505.000 67 668 6074 Prefab Pav Mrk Ty C (W) (12") (Sld) Lf 837.000 68 668 6076 Prefab Pav Mrk Ty C (W) (24") (Sld) Lf 10,196.000 69 668 6091 Prefab Pav Mrk Ty C (W) (18")(Yld Tri) Ea 6.000 70 668 6092 Prefab Pav Mrk Ty C (W) (36")(Yld Tri) Ea 21.000 71 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 967.000 72 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 2,627.000 73 677 6005 Elim Ext Pav Mrk & Mrks (12") Lf 10,865.000 74 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 4,117.000 75 677 6018 Elim Ext Pav Mrk & Mrks (18")(Yld Tri) Ea 9.000 76 678 6001 Pav Surf Prep For Mrk (4") Lf 157.000 77 678 6004 Pav Surf Prep For Mrk (8") Lf 4,505.000 78 678 6006 Pav Surf Prep For Mrk (12") Lf 837.000 79 678 6008 Pav Surf Prep For Mrk (24") Lf 10,196.000 80 678 6022 Pav Surf Prep For Mrk (18")(Yld Tri) Ea 6.000 81 678 6023 Pav Surf Prep For Mrk (36")(Yld Tri) Ea 21.000 82 682 6018 Ped Sig Sec (Led)(Countdown) Ea 71.000 83 684 6028 Trf Sig Cbl (Ty A)(14 Awg)(2 Condr) Lf 243.000 84 684 6031 Trf Sig Cbl (Ty A)(14 Awg)(5 Condr) Lf 7,200.000 85 684 6079 Trf Sig Cbl (Ty C)(12 Awg)(2 Condr) Lf 1,945.000 86 684 6080 Trf Sig Cbl (Ty C)(14 Awg)(2 Condr) Lf 6,957.000 87 687 6001 Ped Pole Assembly Ea 38.000 88 687 6003 Relocate Ped Pole Assembly Ea 9.000 89 688 6001 Ped Detect Push Button (Aps) Ea 72.000 90 688 6003 Ped Detector Controller Unit Ea 7.000 91 690 6005 Install Of Vehicle Detectors Lf 1,030.000 92 690 6007 Replace Of Ground Boxes Ea 12.000 93 690 6021 Removal Of Timber Poles Ea 1.000 94 690 6030 Removal Of Pedestrian Push Buttons Ea 61.000 95 690 6094 Remov Ped Sig Led Traf Sig Lamp Unit Ea 55.000 96 690 6123 Relocate Of Pedestrian Push Button Ea 15.000 97 5114 6003 Conc Sidewalks (5")(Historic Areas) Sy 34.000 98 6001 6001 Portable Changeable Message Sign Day 1,020.000 99 6185 6002 Tma (Stationary) Day 510.000 100 6185 6005 Tma (Mobile Operation) Day 510.000 101

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents