Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Improve Curve Widen Shoulder
Infrastructure
Design
$7,620,000 CJ est. value
Lucerne, CA 95458

Northern California Power Agency - P-Site Road Repairs
Infrastructure
Bidding
$240,000 CJ est. value
Middletown, CA 95461

Northern California Power Agency - P-Site Road Repairs
Infrastructure
Bidding
$240,000 CJ est. value
Middletown, CA 95461

Metal Building PEC / Lakeport
New Construction, Infrastructure - 3,599 SF
Sub-Bidding
$750,000 CJ est. value
Lakeport, CA 95453

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Maha Guenoc Valley
New Construction, Infrastructure
Pending Verification
$798,000,000 CJ est. value
Middletown, CA 95461

Maha Guenoc Valley
New Construction, Infrastructure
Pending Verification
$798,000,000 CJ est. value
Middletown, CA 95461

Effluent Pump Rebuild
Renovation
Design
$60,000 CJ est. value
Lakeport, CA 95453

18th Avenue Road Improvement Project
Infrastructure
Bidding
$3,920,000 CJ est. value
Clearlake, CA 95422

Lakeport Boulevard At State Route 29 Intersections
Infrastructure - 90,000 SF
Post-Bid
$2,000,000 CJ est. value
Lakeport, CA 95453

Kelseyville High School Gymnasium Site Work Project
Infrastructure
Results
$2,000,000 est. value
Kelseyville, CA 95451

Last Updated 02/09/2023 01:31 PM
Project Title

P-Site Road Repairs

Physical Address View project details and contacts
City, State (County) Middletown, CA 95461   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of the Work entitled: Northern California Power Agency Project Description: P-Site Road Repairs NCPA Bid No. GEO 370 12000 Socrates Mine Road Middletown, CA 95461 B. Any bid received after the time and date specified above shall be deemed non-responsive and shall be returned to the bidder unopened. C. Bids received by e-mail or other electronic media shall be considered. 2. General Work Description. The project, as more particularly described in the Bid Documents includes, but is not limited to, the repairing of the road to NCPA's P-Site well pad which consisting of grinding and pulverizing approximately 126,600 square feet of asphalt, grading the road, double chip sealing the road and painting approximately 12,660 linear feet of road striping for fog lines at NCPA's Geothermal Facility. Contractor's License Requirements. A bidder must be a contractor, holding a valid Class A license issued by the State of California, to perform the work for this project. The license must be active and in good standing as of the date of receipt of bids and must be maintained in good standing throughout the term of the contract. Minimum Wage Requirement. Bidders are hereby notified that, pursuant to Labor Code Sections 1770 et seq., the California Director of Industrial Relations has ascertained the general prevailing rate of per diem wages and rates in the locality where this work is to be performed. The prevailing rates are available on the State of California Department of Industrial Relations website and at the Agency's principal office, located at 651 Commerce Drive, Roseville, CA and at the job site. It shall be mandatory upon the Contractor to which the contract is awarded, and upon any subcontractor under the Contractor, to pay not less than the specified prevailing wage rates to all laborers, workers, and mechanics employed in the execution of the contract. Bid Bond. Each bid shall be accompanied by a certified check, cashier's check or bidder's bond payable to NCPA for an amount equal to ten percent (10%) of the amount of the bid. This guaranty will be forfeited to, paid to or retained by the Agency as damages should the bidder to which the Contract is awarded fail to enter into the contract or fail to present satisfactory bonds and/or insurance, as detailed in the Bid Documents, within ten business days of receipt of the Agency's Notice of Award of the Contract. A bidder's bond must be issued by a California admitted surety, and comply with applicable law. Substitution of "or Equal" Materials. A bidder may propose one or more "equals" or substitutions for products listed in the Bid Documents by manufacturer name, brand or model number, unless the Bid Documents specify that the product is necessary to match others in use. Complete information for products proposed by a Bidder as an equal must be submitted to the Project Manager for review, at least ten business days before the time specified for bid opening in accordance with the Instructions to Bidders contained in the Bid Documents Retainage. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement. Payment (Labor and Materials) and Performance Bonds. The successful bidder will be required to furnish a Payment (Labor and Materials) Bond in the amount of one hundred percent (100%) of the contract price, a Faithful Performance Bond in the amount of one hundred percent (100%) of the contract price, and a Maintenance Bond in the amount of ten percent (10%) of the contract price The bonds must be obtained from an admitted surety and comply with applicable law. The successful bidder will also be required to furnish insurance as set forth in the Bid Documents. Permits. The successful bidder shall apply for and obtain at its cost any permits required for all work, except as otherwise specified in the Bid Documents. Bidders must be on time or will be disqualified. The purpose of the conference is to review the bid requirements, to receive bidder questions and to review the site. Each bidder is responsible for signing the attendance sheet at the pre-bid conference to ensure qualified bid status. Any bid received by a bidder other than those included on the attendance sheet will be deemed non-responsive and the bid will be returned unopened. Award of Contract. A. Each bidder shall comply with and agree to all instruction and requirements in this Notice Inviting Bids and in the Bid Documents. All bids must be submitted on the prescribed bid proposal form. B. The Agency reserves the right to reject any or all bids or to waive any informalities in a bid. The Agency will award the contract, if awarded, to the responsible bidder with the lowest responsive bid and whose bid proposal complies with the requirements prescribed. Such award, if made, will be made within ninety (90) calendar days after the opening of the proposals. All bids shall be valid for a minimum of ninety (90) days after the scheduled date for the opening of bids. Notice of Compliance Monitoring. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents