Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Y--Station Service Replacement_Fl-Fg
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Dutch John, UT 84023

Bonneville Junior High School Auditorium Lighting Renovation
Renovation
Sub-Bidding
$50,000 CJ est. value
Holladay Cottonwood, UT 84117

U HOSP Provider Call and Workspace - Electrical
Renovation
Sub-Bidding
$547,932 CJ est. value
Salt Lake City, UT 84132

PCC Improvements Concrete, Fence, Lights, Electrical
Alteration
Post-Bid
South Jordan, UT

Emergency Generators
Alteration
Post-Bid
Herriman, Salt Lake City, West Jordan, UT 84081

2020 Holiday Light Installation and Removal
Results
South Jordan, UT 84095

Rushton Groundwater Treatment Plant General and Electrical Contractor Prequalification
Results
West Valley City, UT 84119

Z1da--(660)--Boiler Ups Backup Power Supply (Va-22-00028885)
Term Contract
Design
Salt Lake City, UT 84148

Jordan High Marquee and Message Boards
Renovation
Sub-Bidding
$234,000 CJ est. value
Sandy, UT 84070

Generator Load Bank Testing
Term Contract
Post-Bid
Salt Lake City, UT

J061--Electrical Switchgear Preventative Maintenance
Results
Salt Lake City, UT 84148

DFCM Construction - Pre-Qualification-General/Mechanical/Electrical/Roofing/Paving/Civil Contractors
Term Contract
Post-Bid

DFCM Construction - UDOT Salt Lake East Maintenance Station Power Upgrade
Alteration
Results
$165,000 est. value
Salt Lake City, UT 84115

Solar PV Racking Design and Materials
Alteration
Post-Bid
South Salt Lake, UT 84119

Last Updated 01/13/2023 10:08 AM
Project Title

Canyon View Elementary Lighting Upgrade (Materials and Installation)

Physical Address View project details and contacts
City, State (County) Cottonwood Heights, UT 84121   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This notice is for those interested in this solicitation. CSD has moved its bidding platform over to Ion Wave. You MUST submit your offer through that system. Please follow the link and register. All information is available on that site. Effective October 25, 2021, Canyons School District is pleased to announce a new online procurement platform for the solicitation of goods and services. If you are interested in doing business with the Canyons School District, you will need to register as a supplier to receive notifications when new solicitations are posted. Scope of work includes replacing all existing lighting within Canyon View Elementary with new LED lighting as well as introducing lighting controls (occupancy/vacancy detection, daylight harvesting, etc.) as required to comply with current energy codes. Existing lighting to be replaced 1 for 1 throughout most spaces. The existing grid structure and light placement is unconventional but will be maintained to minimize clashes above ceiling between existing equipment and new lights, and minimize interruption to the ceiling grid system. 1.2.2 Some instances of existing lights have been removed and will be replaced with a new ceiling tile grid. All existing ceiling devices/elements excluding existing light fixtures are to remain in place. The electrical contractor may remove devices from the ceiling temporarily if required for access but must reinstall any and all existing devices, ceiling grids, wiring, etc that was impacted. 1.2.3 All existing exit signs will be replaced. 1.2.4 Most existing classrooms already have emergency power provided to a light however some spaces require extending the nearest emergency circuit for new emergency lighting within the space. 1.2.5 Existing platform lighting within the gym is to be replaced. 1.2.6 Existing contactor system within the gym to be replaced and new emergency lighting to be introduced. 1.2.7 Work is expected to be completed by July 29, 2022. Question Cuttoff Date & Time 1/5/2023 10:00:00 PM (ET) The extent of electrical work is indicated on drawings and/or specified in Divisions 26 sections of the specification. Provide all labor, materials, equipment, supervision and service necessary for a complete electrical system. Work includes, but is not necessarily limited to, the following items. Existing lighting to be replaced 1 for 1 throughout most spaces. The existing grid structure and light placement is unconventional but will be maintained to minimize clashes above ceiling between existing equipment and new lights, and minimize interruption to the ceiling grid system. 1.2.2 Some instances of existing lights have been removed and will be replaced with a new ceiling tile grid. All existing ceiling devices/elements excluding existing light fixtures are to remain in place. The electrical contractor may remove devices from the ceiling temporarily if required for access but must reinstall any and all existing devices, ceiling grids, wiring, etc that was impacted. 1.2.3 All existing exit signs will be replaced. 1.2.4 Most existing classrooms already have emergency power provided to a light however some spaces require extending the nearest emergency circuit for new emergency lighting within the space. 1.2.5 Existing platform lighting within the gym is to be replaced. 1.2.6 Existing contactor system within the gym to be replaced and new emergency lighting to be introduced. 1.2.7 Work is expected to be completed by August 11, 2023 with substantial completion August 1, 2023. 1. Contractor to refer to specifications and drawings within for additional project requirements. 2. Final product to deliver updated, energy efficient LED lighting with code compliant lighting controls throughout the building. 3. All work must be completed within the 2023 summer break. 4. Contractor must be able to meet and comply with all CSD Terms & Conditions. 5. Company must be able to provide CSD with all bonding requirement. 6. Company must have been in business at least 5 years and performed three (3) similar Scopes Of Work in that time period. Please provide these projects in your Reference information.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents