Similar Projects
Pre-Qualification for 2021 City Infrastructure Improvement Projects
Bidding
Rochester, NH

Lining Services for Sewer Siphon
Bidding
Less than $175,000 est. value
Hudson, NH

2020 Catch Basin Cleaning
Post-Bid
Atkinson, NH

Wastewater Utility Service FCI Berlin - 120 Months
Post-Bid
Berlin, NH 03570

2019 Sewer Replacement
Results
Goffstown, NH

Underground Utilities Cowper Road
Results
Wolfeboro, NH

2021 Sewer Main Lining Project
Bidding
Lebanon, NH

Catch Basin Cleaning
Post-Bid
Rye, NH

Woodman Road Sewer Replacement
Results
Durham, NH

Catch Basin Cleaning Services
Term Contract
Bidding
Raymond, NH

2021 Catch Basin Cleaning
Term Contract
Post-Bid
Atkinson, NH

Catch Basin Cleaning and Inspection Services
Results
Somersworth, NH

Water and Sewer Utility Improvements
Post-Bid
Less than $4,600,000 est. value
Newmarket, NH

2019-2020 Highway Department Items - Catch Basin Cleaning
Term Contract
Results
Pelham, NH

Strafford Square Utility Relocation Project
Post-Bid
Rochester, NH

Last Updated 12/15/2020 09:35 AM
Project Title

Combined Sewer Overflow 22 Slide Gate Installation

Physical Address View project details and contacts
City, State (County) Lebanon, NH   (Grafton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Performing sewer collection system modifications to add a slide gate to a combined sewer overflow (CSO) overflow pipe. The Project includes design and installation of an aluminum or stainless-steel slide gate with a 2 inch operating nut. The intent of the project is to place a slide gate over the 27 inch CSO outlet pipe so that it can be closed with the ability to re-open if needed. The slide gate mist be able to be operated by a 2 inch operating nut using a regular 2 inch valve wrench. It is required to be operated at the street level not requiring a confined space entry and, if using a rising stem, the stem must not be above the surface of the street when opened fully. A gate valve box will be installed for access to the operating nut. The top of the existing structure will need to be cored to allow this access.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents