Similar Projects
Navy Yard Infrastructure Improvements - City of Philadelphia
Infrastructure
Conception
$3,500,000 CJ est. value
Philadelphia, PA 19102

Upgrade Grounds Space Building 6 Project
Renovation - 400 SF
Design
$100,000 CJ est. value
Philadelphia, PA 19104

Air Handling Unit and Air Duct Cleaning and Sealing
Term Contract
Design
Philadelphia, PA 19112

RFQ - Philadelphia Water Testing
Term Contract
Bidding
Philadelphia, PA 19104

Building 77/87 Complex Perimeter Security
Infrastructure
Bidding
$100,000 CJ est. value
Philadelphia, PA 19112

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

EHRM Infrastructure Upgrades Design Philadelphia VAMC
Renovation
Post-Bid
$5,000,000 CJ est. value
Philadelphia, PA 19104

Fort Mifflin Building 55 Renovation
Renovation
Results
$200,000 to $400,000 est. value
Philadelphia, PA 19153

Building 2, 30 Refrigerator Condensing Unit & Door Repairs
Renovation
Results
$398,799 CJ est. value
Philadelphia, PA 19104

Building 87 Secure Perimeter (ATFP)
Build-out, Renovation
Bidding
$500,000 CJ est. value
Philadelphia, PA 19112

NAVFAC DB Perimeter Wall Repair, Phase 2, NSA-P
Build-out, Renovation
Post-Bid
$1,000,000 CJ est. value
Philadelphia, PA 19114

NAVFAC Replace Steam & Condensate Line between B12 & B4
Build-out, Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Philadelphia, PA 19111

NAVFAC B542 Repair Sprinkler System
Build-out, Renovation
Post-Bid
$500,000 CJ est. value
Philadelphia, PA 19112

NAVFAC DB Replace 15KV Feeder Cable, Bldgs. 4, 5, 12
Build-out, Renovation
Post-Bid
$500,000 CJ est. value
Philadelphia, PA 19111

NAVFAC D/B Replace Emergency/Exit Lights Bldgs. 20, 546, 592 & 1029
Build-out, Renovation
Post-Bid
$500,000 CJ est. value
Philadelphia, PA 19112

Last Updated 07/24/2023 04:22 PM
Project Title

Building 4 Chiller Replacement

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19112   (Philadelphia County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Design-Build (DB) construction project to remove and replace the existing chillers with two (2) low-pressure centrifugal chillers, triple duty valves, piping and electrical equipment (new disconnects, breakers, wiring, etc.) necessary for the removal and installation, and appurtenances as required to make a complete system, which meets the cooling needs of building 4. This procurement has four (4) option bid item. The first option bid item is CLIN 0002 for the design of and for the complete removal and replacement of existing cooling towers in accordance with the drawings and specifications. The second option bid item is CLIN 0003 for the design of and for the complete removal and replacement of existing chilled water pumps and appurtenances needed for a complete system in accordance with the drawings and specifications. The third option bid item is CLIN 0004 for providing a hazardous material survey associated with this project in accordance with the drawings and specifications. The fourth option bid item is CLIN 0004A for removal of asbestos insulation in accordance with the drawings and specifications.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents