Similar Projects
Last Updated | 10/10/2023 03:14 PM |
Project Title | SMD Services IDIQ Gas Piping Restoration, Asbestos Investigation, Air Monitoring and Asbestos Abatement Citywide |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10462 (Bronx County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CR Number:2097766 IDIQ contracts for Gas Piping Restoration, Asbestos Investigation, Air Monitoring & Asbestos Abatement Citywide with Borough Focus. Bid Security Required. Bid Security: 5% of minimum guarantee. P&P Bonds: 100% of the guaranteed minimum. REBID-RFQ#s 421990 BX Focus (formerly 336882-3), 421991 BK Focus (formerly 336881-3), 421992 MN Focus (formerly 336880-3) & NEW 424989 QSI Focus. The scope of work under these contracts is to restore gas services by replacing existing interior piping and when required underground gas distribution piping between buildings up to and including building shutoff valve. These contracts shall be subject to the New York City Housing Authoritys Project Labor Agreement and, as part of its bid, the Bidder must submit (1) a Letter of Assent to the Project Labor Agreement signed by the Bidder; and (2) Letters of Assent signed by each of the Bidder's proposed Subcontractors. The Bidder must submit along with its Bid a Letter of Assent signed by the bidder. All vendors are required to participate in NYCHA's MWBE Utilization Plan. Vendors are required to complete and submit at least ONE of the following items by the due date. MWBE Utilization Plan: Due at time of bid submission OR Waiver (or Partial Waiver) of MWBE Utilization Plan: Must be submitted at least Seven (7) days prior to bid due date. (Requests for Partial Waivers MUST also be accompanied by MWBE Utilization Plan). Failure to Complete the Mwbe Utilization Plan or Waiver May Deem Your Bid Non-responsive. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% If no responses are received, the due date will be extended Contract term: Three (3) years with two (2) one-year renewals at NYCHAs sole discretion To participate in the Pre-Bid Conference, please follow the instructions below: Option 1: Copy and paste the below into your browser: https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjUxMmQzNTEtNzA3My00ODAzLTk0YjYtNjg2NTI5NTE4OWFm%40thread.v2/0context=%7b%22Tid%22%3a%22709ab558-a73c-4f8f-98ad-20bb096cd0f8%22%2c%22Oid%22%3a%2247969a20-279c-47a3-950a-c7cebaa2c0e3%22%7d Option 2: Join by entering a meeting ID Meeting ID: 243 893 772 096 Passcode: mfFeob Option 3: Call in (audio only) +1 646-838-1534,,763337878# United States, New York City Phone Conference ID: 763 337 878# Option 4: Access the attached document TEAMS Meeting Link - RFQ#s 421990-424989.docx and click on the embedded link to join. RFQ Question Submission Deadline 5/22/22 at 2:00 PM Question and Answer Release Date 5/30/22 at 2:00 PM Please note that in the event NYCHA receives no responses in connection with this RFQ by the original bid submission deadline, the bid submission deadline shall be extended automatically for seven (7) calendar days. The foregoing extension does not in any way limit NYCHAs right to extend the bid submission deadline for any other reason. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |