Similar Projects
Last Updated | 06/16/2022 11:50 PM |
Project Title | Preventative Maintenance and Repair of Fire Suppression Systems, Water Tower and Utility Distribution Systems |
Physical Address | View project details and contacts |
City, State (County) | Colts Neck, Leonardo, NJ (Monmouth County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide services highliged as follows: Services include preventive maintenance, repair service, alter, improve, inspection and testing of Fire Suppression Systems, Water Tower and Utility Distribution Systems in buildings (both interior and exterior), on grounds and roadways (both aboveground and underground) at Naval Weapons Station Earle, Main Side Station, Colts Neck, NJ and the Waterfront Complex, Leonardo, New Jersey. The contract will be for a base period with four (4) one-year option periods, which, cumulatively, will not exceed sixty (60) months. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |