Similar Projects
First Street Pond and Wastewater Pump Station
New Construction
Bidding
Grants, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Equip Brandy Well 1, an Existing Well with a Solar Pumping System
Post-Bid
Cuba, NM 87013

NGWSP 4c-8
Results
$100,000,000 est. value
Shiprock, NM

North Main Sewer Pump Station
Results
Aztec, NM 87410

Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

Effluent Loadout Station
Results
Less than $311,420 est. value
Los Lunas, NM

Construction of Lift Station Improvements
Post-Bid
Estancia, NM 87016

Wastewater Lift Station Maintenance and Repair Services
Results
Las Cruces, NM 88007

Goat Summit Booster Station
Post-Bid
Mescalero, NM

Tank 4 to Tank 1 Booster Pump Station and Transmission Line
Results
Santa Fe, NM 87508

Glenwood Gila Trout Facility
New Construction
Post-Bid
Glenwood, NM

Valley Water and Sanitation District Booster Station
Results
Kirtland, NM 87417

Lift Stations and Forcemains
New Construction
Post-Bid
Ruidoso, NM 88345

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Reported 01/09/2021 12:00 AM
Project Title

Band Replace Sewer and Water System

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Replace Water and Sewer System. Work includes the following items: a.Water: (1) Installing new 6-inch and 8-inch C900 PVC water distribution piping and hydrant leads along Agoyo Lane; (2) Replacing fire hydrants with auxiliary gate valves (open trench excavation); (3) Replacing and reconnecting water service piping and fittings for the shop, the bunkhouse, and the five RV sites; (4) Tying into the existing water main at the Entrance Road-Agoyo Lane intersection; (5) Removing existing water pipe encountered in new trenches and cap pipe ends along trench walls; and (6) Coordinating with future projects to restore disturbed areas. b.Wastewater: (1) Installing new 4-inch and 6-inch SDR 26 wastewater collection piping from the shop, down Agoyo Lane, to the cul-de-sac where a new lift station will be located (open trench excavation); (2) Replacing and reconnecting wastewater service piping and fittings to the shop, bunkhouse, and five RV sites; (3) Installing a new 6-foot diameter precast concrete lift station with duplex alternating grinder pumps and other appurtenances; (4) Installing new 2-inch HDPE DR 11 sewer force main from new lift station to a new manhole at highpoint. (5) Install new 4” SDR 26 Gravity Sewer Main from new manhole at high point to existing manhole by the Visitor’s Center following the gravity sewer line trench and then new trench along Entrance Road (open trench excavation); and (6) Remove existing wastewater collection pipe encountered in new trenches and cap pipe along trench walls. c.RV Pads and Roadway/Cul-de-sac Improvements: (1) Stripping existing gravel/deteriorated asphalt surfacing, stockpiling, removing asphalt pieces larger than 4-inch in diameter, and replacing salvageable gravel; (2) Stripping existing topsoil, stockpiling, and replacing; (3) Importing and installing new ¾” minus base aggregate for re-grading and surfacing of five RV sites and roadway/cul-de-sac improvements for vehicle turnarounds and for areas within Agoyo Lane with deficient surfacing material. d.Electrical: (1) Remove existing electrical hook-up pedestals at five RV sites; (2) Installing new electrical hook-up pedestals at five RV sites; (3) Installing new panels at existing power poles and storage building; (4) Installing new underground conduit in water and sanitary sewer trenches for future voice/data communication installations; (5) Installing new underground conduit and feeders for RV Site #5 and the lift station. Including a H-frame support system for panels and other equipment mounted near the lift station

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents