Similar Projects
Last Updated | 05/31/2023 06:05 AM |
Project Title | Structure Replacement Project 4th Avenue |
Physical Address | View project details and contacts |
City, State (County) | Plainfield, WI 54966 (Waushara County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $199,689 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Structure Replacement The bidder, if awarded the project, agrees to begin the work no sooner than May 16th , 2022 (unless written approval is given by the town and engineer) and complete the work no later than September 15th , 2022. The Town of Plainfield plans to replace a structurally deficient and functionally obsolete bridge that carries 4th Avenue over Big Roche A Cri Creek. The project is located 0.8 miles north of CTH O. The project includes replacement of the existing structure that is a 19 feet long concrete flat slab structure with concrete abutments and wingwalls. The proposed structure will consist of two 8 feet by 5 feet precast concrete box culverts; total length will be 64 feet and will be placed at a 37 degree skew to better match the stream flow path. Location and general plan overview shown below. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |